Owing to the gigantic character of the work it was divided into several
distinct sections comprised as follows--
MILES
1. The Western Siberian Railway from
Tcheliabinsk to Obi 885·14
2. The Central Siberian Railway from Obi to
Irkutsk, subdivided into two parts, the
first from Obi to Krasnoiarsk, and the
second from Krasnoiarsk to Irkutsk 1143·75
3. The Baikal Railway from Irkutsk to
Myssovaia 192
4. The Trans-Baikal Railway from Myssovaia
to Stretensk 690·4
5. The Amur Railway from Stretensk to
Khabarovsk 1383·75
6. The Ossouri Railway from Khabarovsk
to Vladivostok 476·8
This was the manner in which the 4,771 miles of line constituting the
link between the Urals and the eastern seaboard of the Pacific was
split up. The difficulties that were likely to be encountered were
realised only too well. Though great engineering achievements were
not to be permitted from lack of funds, it was recognised that in
certain places heavy initial expenditure could not be avoided. The
rivers which flow northwards to the Arctic sea, and thus cut across the
direction of the railway at right angles, were to be feared the most,
owing to their great widths, velocity, and the ice-packs with which
they were obstructed during the early spring. Here metal only could
be employed, and as the waterways to be crossed were numerous, it was
seen that the expenditure under this heading would have to be enormous.
There was another factor which had to be taken into consideration.
These waterways during the summer season are the great highroads of
communication through the country, and consequently it was imperative
that the rails should be carried at a sufficient height above the
waterways as to offer no obstruction to steamboat navigation.
As a matter of fact, it may be conceded that the huge bridges across
such rivers as the Irtych, Obi and Yenisei constitute the outstanding
features of the work. They were built massively, and although
their erection in many cases taxed the skill of the engineers to a
superlative degree, owing to the difficult conditions prevailing, their
successful completion is a striking tribute to the men responsible for
their consummation. The fact that these waterways were frozen during
the winter, harassed the engineers in one, while it was a distinct
boon in another, direction. Rails could be laid upon the ice, over
which the construction trains could proceed from bank to bank, hauling
the requisite supplies and provisions for the workmen, whereas in the
summer such work had to be effected by ferries and boats demanding
transhipment at the banks, whereby considerable time was lost, as well
as incurring the liability of damage to the material handled.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account