The rigours of the climate were felt severely. The summer is short
and hot, while the winter is long and intensely cold, the temperature
ranging between -5 and -13 degrees, while at times the mercury was
found to descend to -40 degrees. Moreover, the steppe is swept by
terrific winds, and the conditions told heavily upon the labourers
working in such an exposed situation. In summer, after making
allowances for wet and fête days, only about 120 days were left for
operations, and consequently it was essential to continue work during
the winter as far as practicable. The sparsely-populated character
of the country militated against the engineers, and the labour for
the most part had to be brought from Europe, for the peasants were
unaccustomed to navvy work. The scarcity of water was another adverse
factor, that found in the more sterile reaches being brackish and unfit
for consumption. To meet this contingency water had to be brought over
long distances for the workmen, while in places artesian wells were
sunk which relieved the situation slightly. Under these conditions the
completion of the 885 miles of line comprised in this section within
four years was an excellent piece of work.
The Central Siberian railway, as it ran through two diametrically
different stretches of country--plain and mountainous respectively--was
subdivided into two divisions. The first section, stretching from the
banks of the Obi, where it connected with the Western Siberian railway,
was taken in hand in May 1893, and the work was pushed forward so
vigorously that it was completed in advance of the scheduled time.
Trains from St. Petersburg could not run over this section, however,
until two years later, as the struggles of the engineers upon the
mountains, in the second moiety, demanded the utilisation of the first
section for the handling of their supplies and material. The broken
country proved to be exceedingly troublesome. Moreover, a large number
of wide waterways had to be crossed, such as the Yenisei, where a
magnificent bridge 2,856 feet in length had to be erected. It is a
massive structure, and at present constitutes the largest and heaviest
work of its description in Siberia.
The traveller as he rolls over the iron road cannot resist contrasting
the solidity and permanent appearance of these noble bridges with the
temporary character of the line in other places. The difference is so
great as to be incongruous. Yet it was in accordance with the original
plans. The earthworks and permanent way can be replaced at leisure,
but the bridges, and the reputation of the rivers they span, led the
authorities to decide that in these instances first cost should be
last cost. When the whole railway is brought up to the standard of the
bridge-work, it will be comparable in solidity and travelling comfort
with the leading lines of other countries.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account