The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
Although on the eastern side of the continent the engineer is spared
the ravages of snow and avalanches, he suffers from other disturbing
elements which perhaps are more to be dreaded. These are floods,
wash-outs and landslides. The rainfall in this territory averages
between 90 and 100 inches during the year, and when the rainstorms
break the downfall is tremendous. The rivers are converted into roaring
cataracts, huge cavities are torn in the flanks of the mountains, and
enormous quantities of debris are released. Should the line be in
the way of such a visitation it suffers severely. It is no uncommon
circumstance for a huge gap to be cut in the railway, showing where
the tearing water or descending mass of earth has crashed through the
track, sweeping everything before it. Nothing can withstand the force
of these onslaughts, and although heavy retaining walls of masonry
may serve to check their fury, they are not completely successful.
The result is that when the rains are expending their violence, the
engineer-in-chief is prepared for some heavy repairing work, for
possibly 100,000 tons or more of earthen embankment may be demolished.
Then the engineer hurriedly completes a new survey, and replaces the
track around the scene of the accident, because reconstruction, as a
rule, is more economical and quicker than attempting to repair the
injury inflicted.
This, at times, and in a cramped valley, is no easy task, for the
curvature has to be borne in mind. Consequently the destruction often
precipitates a pretty engineering problem, extrication from which
depends upon the engineer’s resources and ingenious ability entirely.
There is no doubt that the control of a South American railway, where
such conditions as these prevail, imposes a supreme task upon a man’s
capacity. Wash-outs and landslips will find the engineer out more
quickly than any other emergency, because he is called upon to keep
the track going at all hazards, and when a breach does occur, his own
enterprise and initiative alone determine the length of the period
of interruption to traffic. On such a line as the Leopoldina railway
this is a serious factor, because there is a constant heavy volume of
produce, especially coffee, maize, tobacco and sugar, pouring towards
the coast. During a recent year floods, wash-outs and landslides
cost the railway no less than, £24,500, or $122,500. This was a
year of abnormal disaster in this direction, but the item generally
approximates between £12,000 and £14,000, or $60,000 and $70,000, in
the course of the twelve months.
[Illustration: THE BRIDGE OVER THE PARAHYBUNA RIVER AT CAMPOS UNDER
CONSTRUCTION]
[Illustration: THE PARAHYBUNA RIVER BRIDGE COMPLETED. TOTAL LENGTH
1,113½ FEET
The crossing of this waterway by the Leopoldina Railway created a riot
in Campos.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account