But though the fight offered by the rock was stern, that presented
by the muskeg was every whit as bad, though it was of a different
character. The great danger against which the company had to contend
was the creeping of the rails. The spongy nature of the soil over which
the track was laid caused a movement of the metals under the weight
of a passing train. It was just as if the rails had been laid on a
mass of resilient india-rubber. The lines would move to one side or
the other and often widen out sufficiently to permit a train to drop
between them. It was observed that as a train passed the elastic soil
rose and fell in a series of little waves, often attaining a height
of six inches, while the engineers could see the rails moving under
the passing of the train. It was quite out of the question to spike
the rails firmly to the sleepers, since the movement was so great that
the metals would have forced themselves from their foundation. As it
was, the gangers had to overhaul the stretch of track crossing the
muskeg once every week. The engineer strove valiantly to overcome the
eccentric movement of the rails, and only succeeded by dint of great
effort in rendering it perfectly safe. But in this work he had to use
sleepers measuring 12 feet in length, instead of those of standard
dimensions of 8 feet.
Then trouble arose with the contractors in regard to the cost of
excavation. Naturally the expenditure under this heading varied
according to the character of the material encountered, for obviously
gravel, clay, and loam were far easier and cheaper to remove than rock,
and this latter varied in its workability according to its geological
formation. In one case this dispute became a bitter bone of contention
between the company and the contractors. Upon the completion of the
work the former came to the conclusion that it had been charged an
excessive sum for the work, and upon consideration of the returns of
the earth removed were convinced that an erroneous return had been
made. Amicable adjustment of the difference proving fruitless, recourse
had to be made to the courts, and the authorities ordered the cutting
to be re-measured so as to determine the quantity of soil removed.
In one instance the contractors were forced to return a sum of about
£60,000, or $300,000, and many other firms of constructional engineers
had to make repayments. It was not a question of fraud, but purely
misinterpretation of the character of the soil handled; yet it served
to promote inharmonious working between the company and its contractors.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account