[Illustration: BUILDING THE GRADE. THE DREDGER CUTTING ITS OWN PATH AND
DUMPING REMOVED SPOIL IN CENTRE TO FORM THE EMBANKMENT FOR THE TRACK]
[Illustration:
_Photos, Hill_]
THE EMBANKMENT COMPLETED, WITH THE CANALS DUG BY THE DREDGERS ON EITHER
SIDE]
The only difficulty experienced in this manner of handling the marsh
was that the marl torn out by the grabs and deposited upon the
right-of-way was so saturated after its immersion for centuries that it
dried very slowly, and delays were frequent and heavy in consequence.
One layer of the dump had to be left exposed for a considerable
time before the next could be added. But the method of building the
embankment proved so eminently successful and efficient, that a new
move was made to meet the necessity for allowing the excavated soil
time to dry. Four additional dredgers were built, two for each canal,
and these were set to work at intervals one behind the other. The
foremost dredger laid the foundations of the embankment, the second
raised it a further height some days later, and after another interval
of time, the third dredger contributed its quota to the constructional
work. In this way the task was expedited very materially. In some
places the bog was found to be covered with mangrove trees, the roots
of which spread like a thick net through the soil. The consequence was
that the grabs tore up a large proportion of roots associated with the
soil, and the former had to be used for embanking purposes, as it could
not be separated from the inorganic matter. But this fibrous substance
dried very quickly, and was so highly combustible that it had to be
covered with a thick layer of broken stone to protect it from fire, and
also to ensure solidity by packing tightly.
[Illustration: HOW THE EMBANKMENT WAS BUILT ON THE KEYS
The dredged material was pumped through the pipe line to fall between
wooden fences to form the grade.]
[Illustration:
_Photos, Hill_]
HOW THE REINFORCED CONCRETE ARCHES WERE BUILT WITHIN WOODEN MOULDS
BUILDING THE “OVER-SEA” RAILWAY]
The completed track has a somewhat novel appearance. There is the
ridge of earth, flanked on either side by a broad ditch, cut by the
dredgers and running as equidistantly from one another as if drawn
with a parallel ruler. These side canals, however, serve to drain the
permanent way to a certain extent.
When the railway-builders made their way through this inhospitable
region they did not meet a vestige of civilisation for over 30 miles.
Then they came across pathetic evidences of attempts at reclamation
here and there in the form of tumbling homes and isolated parties of
half-starved negroes, vainly endeavouring to extract some sort of
subsistence from the bog.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account