To enable the subaqueous portions of the piers to be built, coffer-dams
were erected around the sites, the space within being emptied and kept
clear of water by means of powerful pumps. By this means the workmen
were enabled to carry out their task of securing the fabric to the
solid rock on the dry coral sea-bed. Where the water ran up to a depth
of 30 feet, and the situation was exposed to the full fury of gales and
of the Atlantic, caissons were sunk for the purpose of constructing
the piers to above water-level, the men working in compressed air.
The material for constructional purposes was prepared on large,
well-equipped floating plants anchored near by. The timber moulds to
form the shape of the arches were fashioned and bolted together on dry
land, and towed out to sea by tugs to the point of erection and there
set in position.
Some of these series of arches on the amphibious section of the railway
are only a few hundred feet in length; others measure as many thousands
of feet from end to end. For instance, between Long and Grassy
Keys--the islands are known as “keys”--the over-sea viaduct is 2 miles
from end to end.
The viaduct work was confined to the deepest parts of each channel,
being approached from either end over a substantial earthen
embankment. Some idea of how this expedient saved the costly task of
bridge-building may be obtained from the fact that whereas the distance
by the line between Grassy and Long Keys is 29,544 feet--5.6 miles--the
approach embankments aggregate 19,100 feet of this total, the long,
symmetrical line of arches totalling 10,444 feet. In the case of the
gap between two other keys the water is closed by an embankment 21,800
feet in length. In another instance the earthen structure stretches
for 11,950 feet to connect Upper and Lower Matecumbe, but inasmuch
as this channel is used by vessels, the navigable channel is spanned
by a drawbridge 120 feet in length to permit vessels to pass between
the Atlantic and the Gulf of Mexico. In the first 78 miles of track
running out to sea from the mainland no less than 14 miles represent
bridge-work, the remaining 64 miles being carried out on embankments
across the islands and shallow straits, or by timber trestling.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account