The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
In the early days the engineers in their bridge-building operations
suffered the maximum width of a river to dictate what the length of
such a structure should be. Seeing that the normal channels of many of
these waterways are narrow in comparison with what they attain under
flood, this rendered bridge-work exceedingly expensive and intricate.
It is no uncommon circumstance for a waterway, when swollen by the
rains of the wet season, to spread out for a width of three miles or
more. It becomes practically insatiable, the soft earth forming the
banks falling a ready victim to the powerful eroding action of the
scurrying water. The result is worse than that brought about by the
scouring of the River Mississippi, which devours huge masses of land
continually on either bank. When the Indian river falls, unsightly
stretches of undulating sandbanks are revealed, riven by little
back channels and small lagoons, which present a general aspect of
desolation. Under such circumstances, bridging from bank to bank is a
somewhat vague undertaking, for the simple reason that it is difficult
to decide what are the limits of the waterway, because erosion
continues until the water reaches material which defies this action.
The engineer has met this situation now in an ingenious manner. He
determines the channel of the river and keeps it within bounds by means
of an artificial wall or training-bund, which is carried parallel with
the navigable channel, the flow of water through the space between
the inner side of the wall and the shore being obstructed by a solid
embankment which carries the track. This system was employed first by
Mr. J. B. Bell to carry the North-Western State railway across the
Chenab River at Sher Shah, and proved so eminently successful that it
has come into general favour.
[Illustration: THE TRAINING-BUND OR WALL TO NARROW THE GANGES BY 3000
FEET FOR THE CURZON BRIDGE, SHOWING RAILWAY APPROACH]
One of the latest and most interesting, as well as largest undertakings
of this class, is that in connection with the Curzon railway bridge
over the Ganges at Allahabad, for the Allahabad-Fyzerbad railway. At
this point the river flows between high banks of hard clay about 3
miles apart, and so resistant is this earth to scouring action that
erosion has been brought to cessation practically. The width of the
waterway, however, is about 1¼ miles, and when it was decided to
span the river, a great length of steel appeared inevitable.
[Illustration: ERECTING THE PIERS FOR THE CURZON BRIDGE
The training-bund is to be seen in the background.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account