The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
It was in 1886 that the first preliminaries in the actual construction
of this final link in the coast-to-coast railway was made. The
surveys showed the feasibility of the scheme, though it was pointed
out that to climb over the Andes would entail work of a peculiar
character, and that the cost would be tremendous. The critical point
was the negotiation of the summit itself, for the mountain pass is
at an altitude of 12,796 feet. Though commenced in 1886, the scheme
experienced many changes of fortune which hindered construction time
after time. Financial and labour troubles were the two most retarding
factors. By 1891 only 57½ miles were open to traffic; four years later
only witnessed the passing of the 90th milestone. Such slow progress
was deplorable in comparison with the building of the Oroya and
Mollendo railways.
Then came a delay of four years, but in 1899 work was resumed and was
pushed forward to completion. On the Chilian side, owing to similar
troubles, construction was possible only in spurts, and even when the
financial details were adjusted satisfactorily, the scarcity of labour
remained a thorny problem.
The surveys showed that the most practical route westwards from Mendoza
was by following the course of the river of that name right into the
mountain range. In this manner extensive blasting and heavy cutting
could be avoided, except where the mountain-sides dropped abruptly into
the river, and then these would have to be tunnelled.
The constructional engineers followed this location, but only to run
full-tilt into another difficulty which had not been foreseen. The
Mendoza is a South American replica of China’s ill-fated Hoang-ho.
In the low season its placid waters roll leisurely to the ocean, but
when it is swollen by the melting snows it tears along with fiendish
velocity. As its banks are composed only of the soft alluvium brought
down from the mountains, the foaming waters do not find this a very
difficult obstacle, and accordingly carry it away in tremendous
quantities. As a result, the river is for ever changing its channel.
To the railway engineers such eccentricities proved serious
factors. They realised speedily that here was a situation peculiarly
exasperating, for long lengths of track were swept away bodily time
after time. It never could be anticipated where the turbulent water
would break its bounds next. A stretch of permanent way, left safe
and sound in the morning, sometimes was wiped out of existence before
nightfall. All that could be seen of the work possibly was the rails
dipping into the water on one bank and reappearing on the other, the
intervening section describing a graceful festoon in the depths of the
muddy torrent. At times the waters were more freakish. They would burst
upon the track with such violence as to wrench the metals apart; then
only the jagged, twisted ends jutting mournfully into the air on either
side of the new river channel were the sole remnants of the track.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account