When the Western Pacific was projected it was decided to profit from
the mistakes made on the early lines in the first instance. Grades in
particular were to be kept down, especially among the mountains, where
a maximum rise of 1 in 100 was only to be allowed. This line completes
the original idea in connection with the Denver & Rio Grande line by
giving the latter an outlet from Salt Lake City to the Pacific at San
Francisco.
[Illustration: BUILDING THE BIGGEST EMBANKMENT ON RECORD BY HYDRAULIC
SLUICING]
The railway is 725 miles in length, and it was split into three
sections for constructional purposes. The first extended from Salt
Lake City to Oroville at the Pacific foot of the Sierras main range,
the second from the latter point to Oakland on the coast, while the
third was a trying short section right down to the water’s edge, at San
Francisco from Oakland. Building was carried out on the three divisions
simultaneously. Remarkable enterprise was displayed by the liberal
resort to any new time- and labour-saving methods and implements.
In the San Diablo Range the path of the track was interrupted by a
depression 123 feet deep and 1,120 feet wide. That hollow had to be
filled to preserve the grade. To expedite the task, an ingenious tool
was devised. This was an electric scraper, and the idea was to pull
this down the side of the mountain, thereby removing several tons of
earth at a time, and to shoot it into the gulch. But the scraper did
not come up to expectations. Breakdowns were so frequent that at last
it was dismantled in disgust and thrown on one side to rust. Then
another ingenious idea was tested. This was called a “merry-go-round,”
something very similar to a roundabout. It comprised a revolving table
overhanging the edge of the dump or embankment. A track was laid on
the circumference of this turntable forming a loop. The laden trucks
were run round this curve and their contents were shot overboard at the
point desired, the empties continuing round the loop to the track to
return to be refilled. The advantage of this arrangement was that the
spoil could be discharged just where it was wanted much more quickly
and easily than by the ordinary method, where the cars are pushed to
the edge of the temporary track, emptied and then pulled back. As the
bank grew outwards across the valley, the merry-go-round was pushed
forwards, so that it always stood on the brink of the earthwork.
[Illustration: THE “MERRY-GO-ROUND” DEVISED TO EXPEDITE RAISING AN
EMBANKMENT 120 FEET HIGH]
[Illustration: A LOFTY EMBANKMENT IN COURSE OF CONSTRUCTION. IN THE
CENTRE IT IS 120 FEET HIGH. CONSTRUCTION CAMP IN FOREGROUND
A NOVEL EXAMPLE OF THE RAILWAY BUILDERS’ INGENUITY]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account