The completion of such a project within three years was truly an
epoch-making achievement, and, as might be supposed, a long string
of record-breaking feats accompanied its realisation. In 36 months
£17,000,000, or $85,000,000, were expended in the boring of tunnels,
the erection of 20 miles of bridges, cuts and fills to fashion a new
steel highway, and to pave it with 200,000 tons of rails. Some days the
mechanical track-layer, with its load of sleepers and rails, advanced
so rapidly that 5 miles of track were laid between sunrise and sunset.
Curiously enough, this new line was commenced from the banks of the
same river as signalled the commencement of the first railway to the
Pacific--the Missouri River--but at Mowbridge, a point some miles to
the north. At the very commencement heavy expense was incurred in the
building of a huge bridge across the waterway, which alone absorbed
£400,000, or $2,000,000. It crosses North Dakota and Montana, where
it was no uncommon circumstance to encounter isolated homesteads, the
owners of which had to travel 150 miles to post a letter--a duty which,
under the circumstances, was performed about once in 6 or 12 months.
In Montana the line drops into the valley of the Yellowstone River to
cling to its banks. While the river winds in and out in an amazing
manner, the railway follows practically a straight line through the
valley, and for 117 miles it is one of the fastest stretches of track
in the whole continent, there being an imperceptible rise. On paper it
seems but a simple task to build such a piece of straight, level track,
but in this instance it proved very expensive, for the river is crossed
about once in every mile, there being 115 bridges in the 117 miles.
After leaving the Yellowstone River the work became more difficult, for
three ranges of mountains had to be overcome. The battle with Nature,
which had been fought by the Southern, Western, Northern Pacific and
Great Northern railways respectively, had to be waged again.
At times the preservation of an easy grade proved a very knotty
problem. The end was achieved only by prodigious earthworks, frequent
tunnelling, as well as lofty trestling across the ravines. The curves
were kept very easy, galleries being cut in the projecting humps to
enable the line to follow the contour of the mountain sides, while the
summits were conquered by driving tunnels through their crests at as
low an altitude as practicable.
The most noteworthy tunnel is the St. Paul Pass, and here a striking
record was set up, the mountain being pierced at a greater speed than
has been achieved in any previous undertakings of this character. It
was bored from both ends simultaneously, and although it was solid,
hard rock for practically the whole of its length, an average advance
of some 540 feet per month was maintained, the highest rate of progress
being reached with a monthly progress of 732 feet.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account