At first it appeared impracticable to ease this situation, but the
chief engineer was called in and urged to find a means of extricating
the company from the predicament. After several months’ survey around
this sheet of water he prepared plans which he submitted to his
directors. They were extremely audacious. He suggested the abandonment
of 373 miles of the old line completely, as it was beyond improvement.
In its place he proposed 326 miles of new track, which not only showed
a saving of 57 miles in distance, but gave no ruling grade exceeding
21.12 feet per mile. At one point he was baulked by the configuration
of the country in the Pequop range, where a grade of 74 feet to the
mile was found unavoidable. Moreover, he showed a saving of over
half-a-mile in vertical height, the climb on the westward run being cut
down from 4,550 feet to 1,535 feet, and on the eastward journey from
4,456½ feet to 1,444 feet.
The salient feature of the scheme, however, challenged particular
attention. Instead of running around Salt Lake he advocated a route
across it, giving a line as direct as the bird flies from shore to
shore, supported on earthen embankments where such could be erected,
and in other places upon a timber viaduct. Some idea of what this
scheme represented may be gathered from the construction of a bridge
from Dover to Calais--a project that has been promulgated--for the
distance was about the same.
The engineer was prompted in his belief as to the practicability of the
suggestion from his personal investigations. Popular fancy had clothed
this stretch of salt water in many legends, one of which was that its
depths were unfathomable. This fallacy was scattered to the winds when
soundings were taken, for the water was found to be comparatively
shallow at the point it was contemplated to cross the lake. Collis P.
Huntington hesitated from embarking upon the scheme when it was first
unfolded, partly on account of its estimated cost, but more because of
its unusual character.
However, when E. H. Harriman secured the control of the line, he
entertained no qualms. His engineer said it was feasible, so it must
be done to avoid that laborious haul over the hills to the north. Work
commenced forthwith, and was pursued with great vigour. When the bank
of the lake was gained, the engineer pushed the earthen embankment
as far into the water as he could, so as to reduce the extent of the
trestling. The distance from shore to shore was 27 miles, but as he
took advantage of a peninsula which juts well into the water from the
north bank, four miles of the line were built on dry land.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account