As a matter of fact, the extent of timber trestling upon this railway
cannot fail to impress the visitor. In the valleys the line is laid
almost entirely upon a wooden grade, owing to the absence of stable
solid ground upon which to raise embankments, while the rivers are
spanned by steel bridges ranging in span from 80 to 100 feet in the
clear. As the rivers rise and fall considerably according to the
season, the abutments had to be set well back from the low channel,
and, moreover, had to be protected heavily by piling to withstand the
severe scouring that takes place when the waterways are in flood and
they rush along with the speed of a cataract.
More than 50 per cent. of the work through the canyon is tunnelling,
which aggregates 2,800 feet out of 4,800 feet. There was no other
way of overcoming the abrupt cliff-sides, and but for the rifts and
clefts in their flanks its extent would have been greater. This was the
work which occupied so much time and consumed so much money, for the
rock was found to be intensely hard. Steam drilling was attempted at
first, but the temperature within the borings rose so high as to become
intolerable. Therefore this plant had to be discarded in favour of
compressed air drills. With their aid a hole 21 feet in height, by 14
and 16 feet in width, to carry a single track, was hewn and blasted out.
The installation of the power plant to operate the drills was a pretty
problem. It could not be set up on the same side of the canyon as the
borings were being made, so had to be rigged up at a convenient point
on the opposite wall near the upper end of the gorge, the power being
transmitted through piping. In order to carry the latter across the
gulch a temporary suspension bridge 130 feet long was erected, and as
it was also employed for the purpose of conveying materials and men
from one cliff to the other, was made heavier than otherwise.
In addition to perforating the shoulders of the mountains, deep clefts
in the mountain faces had to be spanned or masses of obstructing rock
had to be blown out of the way. In one instance there was a couloir
which required a 90-foot span bridge to cross from one side to the
other, while in another case 300 feet of solid rock, aggregating over
50,000 tons of rock, had to be torn down to enable the grade to proceed
from one tunnel to the other. About thirteen months were required to
carry the line through this stretch of 4,800 feet.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account