The Rise of Rail-Power in War and Conquest, 1833-1914Pratt, Edwin A.
History
The Rise of Rail-Power in War and Conquest, 1833-1914
Pratt, Edwin A.
Railroads; Transportation, Military
The distance of the territory now attacked and the desire of
the Tsar to maintain peace were the causes of the impossibility
of preparations for war being made a long time in advance.
Not only, too, was the seat of war 5,000 miles away, and not only was
a single-track ill-equipped line of railway the only practicable means
of sending troops and war material there by land, but an exceptionally
great obstacle to traffic had to be met owing to the interruption of
rail communication by Lake Baikal.
Having a length of 380 miles, a breadth ranging from eighteen miles to
fifty-six miles, a mean depth of 850 feet (with a maximum, in parts, of
no less than 4,500 ft.), and a total area of over 13,000 square miles,
_Lake Baikal_ ranks, next to the great lakes of the United States and
Central Africa, as the largest fresh-water lake in the world; though it
should, in reality, be regarded less as a lake than as a great inland
sea. As it happened, also, this vast expanse of water stood in the
direct line of route of the Trans-Siberian railway, and the crossing of
it by the Russian reinforcements going to the Far East constituted a
seriously defective link in the chain of communication.
At an elevation of 1,360 feet above sea level, the lake is subject
alike to severe gales, to heavy fogs, and to frosts so intense that in
mid-winter the water may be frozen to a depth of ten feet. From the end
of April to the end of December troops and travellers arriving by rail
at one side of the lake crossed to the other by passenger steamers.
Goods wagons were taken over by ferry-boats which, also, acted as
ice-breakers early and late in the winter season, so long as the passage
could be kept open. When, in the winter, the ice was strong enough
to bear, traffic was conducted by transport sledges; but when there
was sufficient ice to stop the ferry-boats, though not sufficient to
permit of the sledges being used--conditions which generally prevailed
for about six weeks in the year--the traffic had to be discontinued
altogether.
The question will naturally be asked,--Why had not the constructors of
the line avoided these disadvantages by carrying it round the lake? The
reply is that this had not been done, prior to the outbreak of war,
owing to the formidable nature of the work involved from an engineering
point of view.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account