The Roman Wall: A historical, topographical, and descriptive account of the barrier of the lower isthmus, extending from the Tyne to the Solway, deduced from numerous personal surveysBruce, J. Collingwood (John Collingwood)
History
The Roman Wall: A historical, topographical, and descriptive account of the barrier of the lower isthmus, extending from the Tyne to the Solway, deduced from numerous personal surveys
Bruce, J. Collingwood (John Collingwood)
Great Britain -- Antiquities, Roman; Walls, Roman -- Great Britain
I am quite satisfied, in my own mind, that the general character of
the work on the Wall was adapted to suit the time, the country, and
more especially, the labourers employed on the work. The Wall, being a
work of defence, had to be constructed in haste; the country was wild,
rude, and without roads, excepting such as the Romans caused to be
made. This ‘caused to be made’ is I think, the key to the character of
the masonry chosen.... The form of construction is the easiest and
strongest which rude, uneducated men could accomplish; and, with good
mortar, such as the Romans knew so well how to make, is the kind of
work calculated to endure for centuries, as we find it has done....
The works of the Wall I consider to have been chiefly constructed by
the natives, under the armed superintendence and teaching of the
soldier. The Roman knew no right but that of the conqueror; his object
was conquest for use; use of the land, and the labour that was upon
it. The Roman soldier was a fighting animal, and was so far civilized
as to know how to make the comparative savage do his work upon his
plan, and this was shaped to suit the labour used. Consider the length
of the Wall, and the extent of the works upon it, and it will be seen
that for the army to have constructed it, would have been to have kept
them constantly working instead of watching and fighting.
Some years ago I had a large quantity of heavy masonry to construct on
one of the railways. It was not unlike the Roman Wall in character. I
found a difficulty in dealing with the regularly educated mason, and
bought several scores of trowels and hammers; these I placed in the
hands of uneducated labourers, set them to work under the
superintendence of educated foremen, looking after the whole myself.
This is a case similar to the one I have imagined for the great Wall;
only the work my labourers performed had more difficulties about it
than the Wall, and yet, these uneducated men performed the work
perfectly.[40]
Think of the Roman bringing in at the sword’s point, hundreds of
captive natives, placing for the first time tools in their hands,
indicating the work to be done, and compelling the trembling slaves to
do it![41]
The stones employed in building the Wall and stations were very
carefully selected. When good stones were to be had near at hand, they
were taken; but those of inferior quality were never used to avoid the
labour of bringing better from a distance. In some parts of the line, in
Cumberland especially, the stone must have been brought from quarries
seven or eight miles off. A quartzose grit was generally selected not
only on account of its hardness, but because its rough surface gave it a
firmer adhesion to the mortar. The stone which has been used in the
works at Wallsend is of a much coarser grit than any that is found in
the neighbourhood.
[Sidenote: THE QUARRIES USED.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account