The
large masses were first lowered, and then smaller stones, quarry rubbish,
&c., to fill up the interstices. The structure was completed in 1841, with
the use of 3,670,444 tons of stone(62) and at a cost of something like a
million and a half of money. A distinguished French engineer, M. Dupin,
who visited the works during their progress, describes in glowing terms
the admirable arrangements, the order and regularity visible in all the
proceedings. “Those enormous masses of stone,” he remarks, “which the
quarrymen strike with heavy strokes of their hammers; and those aerial
roads of flying bridges, which serve for the removal of the superstratum
of earth; those lines of cranes, all at work at the same moment; the
trucks, all in motion; the arrival, the loading, and the departure of the
vessels, all this forms one of the most imposing sights that can strike a
friend to the great works of art. At fixed hours the sound of a bell is
heard, in order to announce the blasting of the quarry. The operations
instantly cease on all sides; all becomes silence and solitude. This
universal silence renders still more imposing the noise of the explosion,
the splitting of the rocks, their ponderous fall, and the prolonged sound
of the echoes.”
“The waves,” said Rennie, “were the best workmen” in the construction of a
breakwater of rough stones, and on the whole his belief was confirmed, for
the storms by which his great work was assailed rather helped than
hindered it, by showing the most desirable slope on the sea-side, while
comparatively little damage was done. The slope of the stone barrier was,
however, by their force changed very greatly. An inclination of three to
one was altered to about five to one, and Rennie had recommended that the
authorities should take a lesson from nature and finish the breakwater
according to her teachings. “It would appear,” says Mr. Smiles,(63) “that
Mr. Whidbey, the resident engineer, contrived to finish most of the
exterior face at a slope of only three to one, as before; and that it
stood without any material interruption until several years after Mr.
Rennie’s death. By that time nearly the whole of the intended rubble,
amounting to 2,381,321 tons, had been deposited, and the main arm, with
200 yards of the west arm, making 1,241 yards in length, had been raised
to the required level. The work had arrived at that stage when it had to
experience the full force of another terrific storm, which took place on
the 23rd of November, 1824. It blew at first from the south-south-east and
then veered round to the south-west, and the effect of this concurrence of
winds was to heap together the waters of the Channel between Bolt Head and
Lizard Point, and drive them, with terrific force, into the narrow inlet
of Plymouth Sound. This storm was not only greatly more violent, but of
much longer duration than that of 1817. When the breakwater could be
examined it was found that out of the 1,241 yards of the upper part, which
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account