_The Red Sea Line._--Mr. Lionel Gisborne had obtained powers from the
Turkish Government to carry a telegraph-line across Egypt and lay a
cable down the Red Sea. The importance of this line to Great Britain led
the Government to give definite assistance.
The first portion of the proposed cable--from Suez to Aden, with
intermediate landings--was laid in 1859. The different sections broke
down one by one. They were all laid very taut, the slack in some cases
being less than one per cent, though the bottom was in certain parts
very uneven. The second portion of the line, from Aden to Kurrachee,
with intermediate stations, was laid during 1860, the slack working out
at 0.1 per cent only. Faults developed very quickly in all the sections
of both portions of the line. Apart from the small allowance for slack,
the type of cable adopted was of far too fragile a nature for some of
its rough, reef-like resting-spots; indeed, the undertaking was spoken
of as "like running a donkey for the Leger"! The promoters of this
enterprise, having neither specially qualified men nor the necessary
materials for carrying out repairs, were obliged to abandon it before
any commercial work had been effected. This was a most unfortunate line
in every way, for a complete message was never got through the entire
length, but only through each section separately. Nevertheless, until
quite recently, it cost Great Britain £36,000 per annum.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account