The Story of the East Riding of YorkshireBrowne, Horace B. (Horace Baker)
History
The Story of the East Riding of Yorkshire
Browne, Horace B. (Horace Baker)
Yorkshire (England) -- History
The Leeds and Selby Railway Company having been formed, work was
proceeded with on plans drawn up by another engineer, Mr. James Walker,
and the line was declared open for traffic in 1834.
In the following year a new Company, known as the Hull and Selby Railway
Company, was formed, with Mr. Henry Broadley as Chairman. An Act of
Parliament ‘for making a Railway from Kingston-upon-Hull to Selby’ was
then obtained, and the work of constructing the new railway was pushed
forward rapidly.
This, the first terminal railway to be constructed in the Riding, was
expected to bring with it great advantages. By it Hull would be linked
to Manchester, and Manchester was already linked to Liverpool. Thus
there would be direct railway communication across England from the
North Sea to the Irish Sea.
But, for all this, the scheme met with great opposition. Hull and Selby
were already served by steam packets travelling along the Humber and the
Ouse, and this service was deemed so satisfactory that there was little
chance of the new railway’s proving a commercial success.
Objections were also raised by some of the large landowners, who feared
that the introduction of the railway would very largely decrease the
value of their properties along its route. Such objectors had, of
course, to be conciliated—as was Mr. Raikes of Welton, by a gift of
£10,000 and an undertaking to build a station at Brough instead of at
Welton.
* * * * *
July 2nd, 1840, saw the opening of the first terminal railway in our
Riding, amid scenes of wild enthusiasm at both Selby and Hull, as well
as at the various stations along the line. The first train from Hull to
Selby—as reported in the _Hull Packet_—‘started about a quarter past
twelve, and was nearly two hours in going to Selby. In returning,
however, the Prince performed the trip, 31 miles, in one hour and five
minutes.’[62]
Footnote 62:
The _Prince_ was one of the five engines employed on the new line. The
fastest non-stop run in the British Isles to-day is that made on the
N.E.R. from Darlington to York, when 44-1/4 miles are covered in 43
minutes—an average speed of 61.7 miles per hour.
The first East Riding time-table was a very modest affair, as will be
seen from the reproduction overleaf. The order of arrangement of the
train is seen to be:—Engine and tender, goods waggon, second-class
carriage, first-class carriage, and third-class carriage; but the
last-named is on this occasion occupied by four-legged passengers. It is
recorded that when the passengers in this were two-legged cattle, ‘a
great number of hats were lost’ and many ‘colds and inconveniences’ were
caught—facts at which we shall probably not be surprised.
Several of the regulations of the Hull and Selby Railway seem very
quaint. It was the duty of a _station-keeper_ ‘to conduct himself
civilly,’ and ‘to enter on a waybill the number, class, and destination
of the passengers sent by each train.’
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account