Since the beginning of the century there had been more or less talk
of a canal to connect the Hudson with Lake Erie, and in 1816 the
legislature of New York voted to undertake the building of the Erie
Canal. The adoption of this plan and its success were due mainly to
De Witt Clinton, who set forth in a carefully reasoned memorial the
advantages of the proposed waterway. For years thousands of men had
been employed in the work, and many difficulties had been met and
solved. Commissioners had been appointed to determine the route which
the canal should follow and to oversee its construction. They conducted
operations in three sections, intrusting the job of digging and filling
to contractors, no contract covering any large amount of territory.
The eastern section extended along the line of the Iroquois trail up
the Mohawk Valley from Albany to Rome. On this part of the route swift
streams had to be crossed, and falls and rapids had to be passed. Where
the canal crossed creeks and streams, guard locks were built to keep
the water from rushing into the canal and overflowing it. At Little
Falls there was such a narrow space between the mountains that rocks
had to be blasted to make a bed for the canal, and a wall twenty or
thirty feet high, rising from the channel of the Mohawk River, built
to support it. Other falls on this section required aqueducts and
elaborate series of locks.
The middle section followed the line of trail and turnpike as far as
Syracuse, and then went northwards to Clyde and Montezuma. It had the
greater part of the “Long Level,” a sixty-nine-mile stretch from a
point east of Utica to Syracuse, without any locks. At Montezuma, near
the beginning of the third section, the builders came to the edge of
the Cayuga marshes, and here they erected an embankment, nearly two
miles long and so high that boats were often seventy-two feet above the
level of the swamps. At Rochester a great aqueduct was built at the
Genesee River. Between Rochester and Buffalo the canal ran for a long
distance inside the great ridge which rises south of Lake Ontario,
but at Lockport it crossed the mountains. Here was performed one of
the most difficult engineering feats of the whole construction. An
excavation was made through the three-mile ridge at an average depth of
twenty feet, and five great locks were built, each twelve feet high, so
that vessels were elevated and dropped sixty feet.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account