One of the most instructive accidents that ever happened to an undersea
boat was the loss and rescue of the German _U-3_. She sank to the
bottom of Kiel Harbor on January 17, 1911. A small spherical buoy
was released and rose to the surface, where it was picked up and a
telephone attached to the end of the thin wire cable.
“Hello!”
“Hello! This is the captain of the _U-3_ speaking. We cannot rise, but
we are resting easy and have air enough to last forty-eight hours.”
“Good. The steam salvage-dock _Vulcan_ has been sent for and will be
here before then, Herr Kapitan.”
But before the _Vulcan_ arrived, it occurred to some one in authority
to attempt to raise the _U-3_ with a large floating crane then
available. The strong steel chain ready coiled at the lower end of the
buoy-line was drawn up and made fast to the crane, which could not
lift the 300-ton submarine bodily, but succeeded in hauling up its bow
sufficiently for the twenty-seven petty officers and seamen on board
the _U-3_ to be shot up through the torpedo tube to the surface. The
captain and his two lieutenants chose to remain. Shortly afterwards
the chain slipped and broke off one of the boat’s ventilators, letting
water into the hull and drowning all three officers.
Then the sea-going, steam salvage-dock _Vulcan_ reached the scene and
brought the _U-3_ to the surface in three hours.
“The _Vulcan_ is a double-hulled vessel, 230 feet in length with a
lifting capacity of 500 tons. The width between the two hulls is
sufficient to admit with good clearance the largest submarines. At
a suitable height a shelf is formed along each wall of the interior
opening, and upon this rests the removable floor of the dock. The two
hulls of the ship are each built with water-tight compartments of large
capacity, similar to those which are found in the side walls of the
ordinary floating dock. When a sunken submarine is to be raised, the
_Vulcan_ steams to the wreck and is moored securely in position above
it. Spanning the well between the two hulls are two massive gantry
cranes, each provided with heavy lifting tackle driven by electric
motors. The first operation is to fill the compartments until the
vessel has sunk to the required depth. The floor of the dock is then
moved clear of the well. The lifting tackles are now lowered and made
fast, either to chains which have been slung around the body of the
submarine, or to two massive eyebolts which are permanently riveted
into the submarine’s hull. At the order to hoist away, the submarine
is lifted free from the mud and drawn up within the well, until its
bottom is clear of the supporting shelves on the inner faces of the two
hulls, above referred to. The dock floor is then placed in position on
the shelves, the water is pumped out of the two hulls, and the _Vulcan_
rises, lifting the submarine and the dock floor clear of the water.”[18]
[Illustration:
Courtesy of the Scientific American.
The _Vulcan_ salvaging the _U-3_.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account