The machines used in the drivage of the tunnel were worked by means of
compressed air. The comminuted rock produced during the boring was
continuously removed by a jet of water squirted into the hole by the
machine—a precaution which was found to be of great economy in the wear
of the tools. Under ordinary conditions the working speed was about 200
strokes per minute, at which rate from eight to ten holes, of 1·6 inches
diameter and 35 inches deep, could be bored in the shift of six hours.
The tunnel is of an [18] section, 13 feet broad and 9¾ feet high; eight
machines were employed at one time; they were mounted on a wrought-iron
frame, which travelled on a railway, and could be removed to a safe
distance when the blasting took place. From 65 to 70 holes were bored in
the face of the rock, and then loaded with uniform charges, made up into
cartridges, and primed with fuses of different lengths, so as to explode
in groups at definite intervals. A horizontal series at about mid height
was first fired, then followed two vertical side rows, then a group near
the crown of the arch, and finally a horizontal series near the floor.
In this way the rock was blown down in nearly uniform fragments of from
six to eight inches in the side. At first, owing to the hardness of the
quartz-slate which had to be pierced, the work went on very slowly; but
at a greater depth, the mountain was found to consist of limestone
strata, so that at length it advanced about thirteen feet per day.
The compressed air which set the borers in motion served also for the
ventilation of the tunnel, as every stroke of the piston liberated
sufficient pure air to drive back to a considerable distance from the
workmen the suffocating gases, produced by the blasting, which otherwise
would render breathing impossible. Air-pumps placed before the entrance
finally conducted the fumes of the gunpowder or dynamite into the open
air. It is evident that the difference in height of the two openings,
and the gradual ascent towards the centre, will insure a thorough
ventilation. In the beginning of September 1869 the Italian side of the
tunnel, which is 5,913 metres long, was completed, while on the French
side only 4,222 metres were accomplished and 2056 remained to be bored,
and it was calculated that this gigantic enterprise would most probably
be terminated by the beginning of 1871. It was, however, completed a few
days earlier.
When Louis Quatorze, that model of regal pomposity, succeeded in placing
the crown of Spain on the head of his grandson Philip of Anjou, he bid
him grandiloquently farewell with the words: ‘Go, my son! the Pyrenees
no longer exist.’ With more truth is our age able now to declare that
the Alps have ceased to be a barrier between nations.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account