the Alps a new highway for the nations. It is one of the greatest
triumphs of modern engineering, one of the grandest monuments of human
skill. It is the longest tunnel in the world, being fifteen kilometres
long, or nearly nine and a half miles; one and a half miles longer
than the Mont Cenis tunnel. In addition to the great tunnel there
are fifty-two smaller tunnels approaching it, making a total length
of tunnels in getting through the Alps fifteen miles. The St. Gothard
railway proper extends from Immensee, in Switzerland, to Chiasso, in
Italy, a distance of one hundred and thirteen miles, and there are in
all not less than fifty-six tunnels, comprising more than one-fifth
of the whole line, or twenty-three miles of tunnelling. The width of
the great tunnel is twenty-six feet and the height nineteen feet. It
requires, at express-train speed, sixteen minutes to pass through it.
It is about one thousand feet below Andermatt, and five thousand to
six thousand five hundred feet below the peaks of the St. Gothard. The
preliminary works were begun at Göschenen, on the north side, June the
4th, and at Airolo, on the south side, July the 2d, 1872. Louis Favre,
of Geneva, was the contractor.[83] On February 28, 1880, a perforation
from the south side penetrated the last partition between north and
south sections, and the workmen on either side exchanged greetings. On
the 22d of May, 1882, the first train passed over the line, and every
town from Luzern to Milan celebrated the completion with banquets and
excursions; and its business, passenger and traffic, at once assumed
immense proportions. The construction cost 56,000,000 francs; which was
partly paid by subventions from Switzerland, Germany, and Italy, the
conditions and respective amounts of which were the subject of a treaty
between these governments. It penetrates the mountain like a corkscrew,
making four complete loops within a distance of twenty miles, in order
to attain the requisite elevation, when it emerges into daylight only
to enter again the main tunnel. The waters of the Reuss and the Ticino
supplied the necessary motive power for working the screws attached
to the machinery for compressing the air. The borers applied to the
rock the piston of a cylinder made to rotate with great rapidity by
the pressure of air, reduced to one-twentieth of its ordinary volume;
then, when they had made the holes sufficiently deep, they withdrew the
machines and charged the mines with dynamite. After the explosion, the
_débris_ was cleared away and the borers returned to their place. This
work was carried on day and night for nearly ten consecutive years.
The official report shows that three hundred and ten of the workmen
were killed by accidents during the building of the tunnel, and eight
hundred and seventy-seven were wounded or received minor injuries. The
work was done by Italians; no others would accept so much toil and
danger for so little pay. There were used in its construction 2,000,000
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account