microfossil examination as part of a check on how the results of the
old surveys compared with the new. Except for some variations relating
to the extent of the cretaceous outcrop in the middle of the Channel,
the findings tallied nicely.
The new Study Group had a number of other elaborate surveys made, too,
on the economic and engineering problems involved in the creation and
operation of a Channel tunnel or an equivalent means of cross-Channel
transport. Besides developing plans for a bored tunnel—the projected
double-rail tunnel, interconnected at intervals by cross-passages,
is essentially a modern version of William Low's plan of the 1860s,
with an extra small service tunnel being added between the main
tunnels—the Study Group's engineering consultants developed in detail
schemes for a Channel bridge, an immersed railway tube, an immersed
road tube, a combined immersed tube with two railway tracks, and a
four-way road system on two levels. The bridge proposed would be an
enormous affair with approximately 142 piers and with four main spans
in the center of the Strait each 984 feet long. These spans would
tower a maximum of 262-1/2 feet above sea level to allow the largest
ships in the world to pass underneath with plenty of room to spare.
The bridge would take no longer to build than a road tunnel, but it
would cost about twice as much, and in addition it would be expensive
and difficult to maintain and would present a hazard to navigation.
The immersed tube proposed for either rail or road traffic (but not
both) probably would cost about the same as a bored tunnel and might
be constructed in four years. A combined road-rail tube would take
about the same time to build, but would be more expensive even than a
bridge. Among the best-known schemes for a combined tube is that of
a Frenchman, André Basdevant, who has proposed one with a four-lane
highway and a two-track rail line. This scheme would pretty much
run along the old Cap Gris-Nez-Folkestone route of Thomé de Gamond,
and it would even have, like most of Thomé de Gamond's schemes, an
artificial island in mid-channel on the Varne. As for the latest
scheme for a laid, rather than a bored, tube, it would be no different
from Thomé de Gamond's plan in 1834 for a submerged tube, and as in
that old plan a trench would be dug, by operations conducted at the
surface, across the Channel bottom to receive the tube, which would be
prefabricated in sections and towed out to sea to be laid down in the
trench a section at a time. This time the digging of the trench would
be carried out from a huge above-surface working platform, something
like an aircraft-carrier deck on sets of two-hundred-foot-high stilts,
that would jack itself up and move on across the Channel as the work
progressed. From these and other surveys, the Study Group concluded
by March 1960 that the best means of linking Britain and France would
be by a rail tunnel, either bored or immersed, which, while avoiding
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account