World War, 1914-1918 -- Naval operations -- Submarine; World War, 1914-1918 -- United States
During the two years preceding the war Captain Reginald R. Belknap
commanded the mine-laying squadron of the Atlantic fleet. Although his
force was small, consisting principally of two antiquated warships, the
_Baltimore_ and the _San Francisco_, Captain Belknap had performed his
duties conscientiously and ably, and his little squadron therefore gave
us an excellent foundation on which to build. Before the European War
the business of mine-laying had been unpopular in the American navy as
well as in the British; such an occupation, as Sir Eric Geddes once
said, had been regarded as something like that of "rat catching"; as
hostilities went on, however, and the mine developed great value as an
anti-submarine weapon, this branch of the service began to receive more
respectful attention. Captain Belknap's work not only provided the
nucleus out of which the great American mine force was developed, but he
was chiefly responsible for organizing this force. The "active front" of
our mine-laying squadron was found in the North Sea; but the sources of
supply lay in a dozen shipyards and several hundred manufacturing plants
in the United States.
We began this work with practically nothing; we had to obtain ships and
transform them into mine-layers; to enlist and to train their crews; to
manufacture at least 100,000 mines; to create bases both in the United
States and Scotland; to transport all of our supplies more than 3,000
miles of wintry sea, part of the course lying in the submarine zone; and
we had to do all this before the real business of planting could begin.
The fact that the Navy made contracts for 100,000 of these new mines
before it had had the opportunity of thoroughly testing the design under
service conditions shows the great faith of the Navy Department in this
new invention. More than 500 contractors and sub-contractors, located in
places as far west as the Mississippi River, undertook the work of
filling this huge order. Wire-rope mills, steel factories, foundries,
machine shops, electrical works, and even candy makers, engaged in this
great operation; all had their troubles with labour unions, with the
railroads, and with the weather--that was the terrible winter of
1917-18; but in a few months trainloads of mine cases--great globes of
steel--and other essential parts began to arrive at Norfolk, Virginia.
This port was the place where the mine parts were loaded on ships and
sent abroad. The plant which was ultimately constructed at this point
was able to handle 1,000 mines a day; the industry was not a popular one
in the neighbourhood, particularly after the Halifax explosion had
proved the destructive powers of the materials in which it dealt. In a
few months this establishment had handled 25,000,000 pounds of TNT. The
explosive was melted in steel kettles until it reached about the density
of hasty pudding; with the aid of automatic devices it was then poured
into the mine cases, 300 pounds to a case, and thence moved on a
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account