The war against Germany and Italy: Mediterranean and adjacent areasHunter, Kenneth E.
History
The war against Germany and Italy: Mediterranean and adjacent areas
Hunter, Kenneth E.
World War, 1939-1945 -- Campaigns -- Italy; World War, 1939-1945 -- Middle East; World War, 1939-1945 -- Pictorial works
[Illustration: ITALY
ACTION DURING THE PO RIVER CROSSING at Ostiglia, 24 April. A
57-mm. antitank gun firing in support of an infantry assault
across the railroad bridge to the north bank of the river. (The
British 6-pounder was the forerunner of the 57-mm. gun. It was
adapted for U. S. use and also manufactured for other United
Nations under the lend-lease agreement as the 57-mm. antitank
gun.)]
[Illustration: ITALY
INFANTRY CROSSING PO RIVER UNDER FIRE, Ostiglia railroad bridge,
24 April. The crossing in this zone was opposed by enemy machine
guns and 20-mm automatic weapons. The patrol above worked its
way to the other side and knocked out enemy guns and crews. The
railroad bridge was partially demolished and unfit for vehicles.]
[Illustration: ITALY
“ALLIGATORS” ABOUT TO CROSS PO RIVER near Ostiglia. Developed by
the U. S. Navy, the first shipment of these amphibian tracked
vehicles arrived in December 1944 and training was begun.
Great secrecy surrounded them and they were kept thoroughly
camouflaged before the dash to the Po. They were armored and
each had socket mounts at four locations for either .30-or
.50-caliber machine guns. A stern ramp could be lowered to take
on a vehicle. Maximum capacity was 8,000 pounds and a crew of
three. (LVT(4).)]
[Illustration: ITALY
FERRYING EQUIPMENT ACROSS THE PO in support of the infantry
assault, Ostiglia, 25 April. The large vehicle is a 76-mm.
gun motor carriage M18, designed for tank destroyer use. It
was a full track-laying type, using a torsion bar independent
suspension, and was front-sprocket driven. The vehicle was
lightly armored, had a low silhouette, and was highly mobile.]
[Illustration: ITALY
PONTON BRIDGE under construction across the Po River near
Ostiglia. This bridge was opened on 25 April. (M2 treadway
bridge.)]
[Illustration: ITALY
INFANTRY ACTION AT VICENZA, in the foothills of the Alps. The
advance of the Allies across the plain was too fast for the
Germans to halt, reorganize, and make a determined stand behind
either the Po or the other rivers in the Po plain. Speedy
thrusts by infantry-armor columns split the enemy forces and
severed communications. After the crossing of the Po, the action
on both sides developed into a race to the Alps, the enemy
hoping to escape into Germany, the Allies determined to prevent
them. Many isolated pockets of resistance developed behind the
advancing columns and special task forces were organized on 23
April to deal with them.]
[Illustration: ITALY
TANK DESTROYER on the shore of Lake Garda blocking one of the
escape routes to Brenner Pass. Heavy fighting took place in the
demolished tunnels on the road along the east shore of this
lake, but on 30 April the area was under Allied control.]
[Illustration: ITALY
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account