In order to give definite information concerning furnaces, fuels
etc., the following data is quoted from a paper by Seth A. Moulton
and W. H. Lyman before the Steel Heat Treaters Society in September,
1920.
This considers a factory producing 30,000 lb. of automobile gears
per 24 hr. The transmission gears will be of high-carbon steel and
the differential of low-carbon steel, carburized. The heat-treating
equipment required is:
1. Annealing furnaces 1,400 to 1,600 deg.F.
2. Carburizing furnaces 1,700 to 1,800 deg.F.
3. Hardening furnaces 1,450 to 1,550 deg.F.
4. Drawing furnaces 350 to 950 deg.F.
All of the forging blanks are annealed before machining, about
three-quarters of the machined gears and parts are carburized,
all the carburized gears are given a double treatment for core and
case, all gears and parts are hardened and all parts are drawn.
The possible sources of heat supply and their values are as follows:--
1. Oil 140,000 B.t.u. per gallon
2. Natural gas 1,100 B.t.u. per cubic foot
3. City gas 650 B.t.u. per cubic foot
4. Water gas 300 B.t.u. per cubic foot
5. Producer gas 170 B.t.u. per cubic foot
6. Coal 12,000 B.t.u. per pound
7. Electric current 3,412 B.t.u. per kilowatt-hour
For the heat treatment specified only comparatively low temperatures
are required. No difficulty will be experienced in attaining the
desired maximum temperature of 1,800 deg.F. with any of the heating
medium above enumerated; but it should be noted that the producer
gas with a B.t.u. content of 170 per cubic foot and the electric
current would require _specially_ designed furnaces to obtain higher
temperatures than 1800 deg.F.
TABLE 28.--COMPARATTVE OPERATING COSTS
Assuming
Cost of oil- and gas-fired furnaces
installed as $100.00 per square foot of hearth
Cost of coal-fired furnace installed as 150.00 per square foot of hearth
Cost of electric furnace 100 kw.
capacity installed as 90.00 per kilowatt
Cost of electric furnace 150 kw.
capacity installed as 70.00 per kilowatt
Output 3,000 lb. charge, 8 hr. heat carburizing, 2 hr. heating
only. Annual service 7,200 hr. Fixed charges including interest,
depreciation, taxes, insurance and maintenance 15 per cent. Extra
operating labor for coal-fired furnace 60 cts. per hour, one man
four furnaces.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account