Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918Benson, Simon
History
Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
The people of Crook County are fully aware of the importance of
highways. Although local funds will not go far, a remarkable beginning
has been made. A County bond issue of $95,000.00 has been voted for road
construction. The general progressiveness and co-operative spirit
existing throughout the County is shown by the fact that $85,000.00 of
the bond issue is to be expended on one road. Reference is made to the
proposed road up Crooked River from Prineville, connecting the east and
west end of the County.
The State Highway Commission has ordered a location survey made of the
Crooked River Highway between Prineville and the Shorty Davis Ranch. The
length of this line will be about thirty miles, and practically a water
grade can be secured. This work will start easily in 1918.
The immediate purpose of the survey is to gather definite data for the
consideration of the State Highway Commission. The County authorities
have made application for State aid and request early consideration of
the matter.
The State Highway Commission is cooperating in the construction of the
Ochoco Forest Road in Crook County.
Ochoco-Canyon Forest Road
The State Highway Commission extended aid to Crook County by helping to
secure Federal aid and by appropriating State funds for the construction
of a nine and seven-tenths mile section of the McKenzie River Highway
between Prineville and Mitchell. This section is adjacent to the Wheeler
County Line and connects up with proposed grading work in Wheeler
County.
Construction work is in progress under the direction of the United
States Office of Public Roads. The cost of this work will be defrayed by
co-operative funds from the State, County and Government. The total
estimated cost is $52,500.00. The following statement shows the
appropriations made for this work:
Total estimated cost of work $52,500.00
Appropriated by State 17,500.00
Appropriated by Government 17,500.00
Appropriated by County 17,500.00
CURRY COUNTY
The most important highway in this County is, of course, the Coast
Highway, which affords an outlet to California on the south and Coos Bay
on the north. Between the Coos County Line and Port Orford the route of
the Coast Highway lies along the foot of the mountains and on a
comparatively level plain and, except in a few cases at river crossings,
the grades of the present road are not excessive. The alignment could be
improved but is satisfactory for the present. A gravel surfacing on this
section makes it passable the whole year round.
South of Port Orford the topography of the County changes. The slopes
are steep; in many cases reaching forty degrees, and are badly broken
up. This section is also subject to slides of which there is abundant
evidence of recent activity. The drainage being at right angles to the
coast must be crossed by the highway requiring considerable rise and
fall in the grade line.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account