The largest concrete bridge so far designed and constructed by the State
Highway Department is that spanning Hood River near the city of Hood
River. It consists of three arch spans 95 feet, center to center of
piers, 110 feet of reinforced concrete approach on the Hood River side
and a short approach on the opposite side.
As in other arch work of similar magnitude studied by the Department, it
was found economical to support the arch superstructures on ribs instead
of using rings extending clear across the roadway, and the open spandrel
idea was carried out.
The concrete viaduct approach on the west side crosses three railroad
tracks which govern the height of the bridge. In order to minimize this
height through concrete girders were used, the girders projecting above
rather than below the roadway slab.
The total cost of the structure complete will be about $48,000.00, of
which Hood River County will contribute $8,000.00. The bridge was built
under contract by Parker & Banfield. Mr. C. E. Carter was resident
engineer on the work.
Herman Creek Bridge
This is a ninety-foot reinforced concrete viaduct on the Columbia River
Highway near Cascade Locks. This structure was built by A. D. Kern in
connection with the grading contract on the Cascade Locks section. The
cost complete was $7,389.06.
Gorton Creek Bridge
This is a 50-foot reinforced concrete bridge at Wyeth on the Columbia
River Highway. It was built by A. D. Kern under the grading contract for
the Cascade Locks Section. The total cost was $3,153.90.
Hood River-Mosier Surveys
Contemplating construction of the Columbia River Highway between Hood
River and Mosier to eliminate the high summit, narrow road bed, and
excessive grades between these points the Department made very thorough
surveys for this important project.
A survey had previously been made developing distance up the Hood River
Valley and reaching a summit of 1,107 feet with a corresponding
additional length required on the Mosier end, making a total distance of
10.7 miles.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account