To eliminate four very heavy grades on the Pacific Highway between Wolf
Creek and Grave Creek in Northern Josephine County, the Highway
Commission appropriated funds for the grading of a 4.9 mile section
between those points. The contract for the work was awarded to the
American Exploration and Construction Company of Grants Pass on November
6, 1917. This construction was practically all on steep side-hills, and
as only a small part of the material to be moved was hard rock, the job
was an ideal one for steam shovel operation and over fifty per cent of
the total yardage was moved by this method. The work was handled by the
contractors in a very creditable manner, and an excellent roadbed was
secured.
The grading was completed on October 20, 1918. The width of roadbed is
20 feet and the maximum grade is 5 per cent. Mr. J. E. Nelson was in
charge of the work as resident engineer.
It is expected that this section will be macadamized during the 1919
season.
DETAILED EXPENDITURE STATEMENT--GRADING--WOLF CREEK TO GRAVE CREEK
Engineering $ 4,872.94
Culvert Pipe furnished by State 3,846.45
Payments to Contractor for Work as follows:
Clearing and Grubbing $ 3,500.00
Common Excavation, 29,426 cu. yds. at .45 13,241.70
Intermediate Excavation, 21,258 cu. yds. at
.45 9,566.10
Solid Rock Excavation, 21,558 cu. yds. at
$1.25 26,947.50
Overhaul, per 100 lin. ft., 6,767 cu. yds.
at .02 135.34
12" Concrete Pipe, 1,077 lin. ft. at .55 592.35
18" Corr. Galv. Iron Pipe, 581.5 lin. ft. at .40 232.60
24" Corr. Galv. Iron Pipe, 162.5 lin. ft. at .50 81.25
30" Corr. Galv. Iron Pipe, 127.5 lin. ft. at .60 76.50
36" Corr. Galv. Iron Pipe, 166.5 lin. ft. at .75 124.87
Class "A" Concrete, 44.67 cu. yds. at $22.50 1,005.07
Class "C" Concrete, 66.72 cu. yds. at $18.00 1,200.96
6" Porous Drain Tile, 400 lin. ft. at .40 160.00
Trestle Timber, 45,968 f. b. m., at $45.00 2,068.56
Metal Reinforcement, 2,506 lbs. at .15 375.90
Extra Clearing, 1.75 acres at $100.00 175.00
Painting Railings on Coyote Creek and Dry Gulch
Bridges (Force Account) 74.94
Gravel Backfilling for Drain Tile (Force Account) 23.50
Culvert Pipe furnished by State 3,846.45
---------
Total Paid to Contractors 59,582.14
----------
Total Cost of Work $68,301.53
Grading--Locust Hill Section
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account