Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918Benson, Simon
History
Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
Engineering $ 1,423.30
Construction:
Common Excavation, 11,397 cu. yds. @ .40 $ 4,558.80
Intermediate Excavation, 6,017.4 cu. yds. @ .70 4,212.18
Solid Rock Excavation, 2,816.5 cu. yds. @ 1.35 3,802.27
12-inch Corr. Iron Pipe, 682 Lin. ft. @ .40 272.80
24-inch Corr. Iron Pipe, 40 Lin. ft. @ 1.00 40.00
Rubble Masonry, 22.3 cu. yds @ 10.00 223.00
----------
13,109.05
----------
$14,532.35
Bridge Creek Grading
The grading of a nine-tenth mile section in Bridge Creek Canyon was
contracted to the United Contracting Co. of Portland, Oregon, on
November 27th, 1917. This section is on the McKenzie River Highway about
four miles west of Mitchell. In addition to the grading, the contract
involved the construction of a ninety foot bridge over Bridge Creek.
The work was started on February 15th, 1918 and completed on June 20th,
1918. The engineering was in charge of Mr. R. H. Coppock.
The total cost of the work was $24,235.45 of which the State paid
$14,235.45 and Wheeler County $10,000. The detailed cost statement
follows:
DETAILED EXPENDITURE STATEMENT--GRADING BRIDGE CREEK SECTION
Engineering $ 635.30
Construction:
Common Excavation, 3935.6 cu. yds. @ .60 $ 2,361.42
Intermediate Excavation, 549.4 cu. yds. @ .75 412.05
Solid Rock Excavation, 9837.6 cu. yds. @ 1.40 13,772.64
Overhaul per 100 lin. ft., 363 cu. yds. @ .03 10.89
12-inch Corr. Iron Pipe, 20 lin. ft. @ .73 14.60
15-inch Corr. Iron Pipe, 108 lin. ft. @ .83 89.64
21-inch Corr. Iron Pipe, 60 lin. ft. @ 1.00 60.00
Rubble Masonry, 1.58 cu. yd. @ 12.50 19.75
Guard fence, 100 lin. ft. @ .85 85.00
1 90-foot Bridge & approaches:
Superstructure and trestle (Lump
sum) $ 5,100.00
Class "A" Concrete in piers, 49.24
cu. yds. @ $34.00 1,674.16
----------
$ 6,774.16
----------
$ 23,600.15
-----------
$ 24,235.45
Macadamizing on Cummins Hill Section
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account