Description of Work of the
State Highway Department
In the
Counties of the State
1917-1918
BAKER COUNTY
Although Baker County is generally well supplied with railroads there
are sections still isolated and much in need of improved transportation
facilities. Some of the most fertile and productive areas of the County
are not served by rail transportation and depend upon roads for
communication with railway points. This situation with the character of
the winter season and soil conditions found here render improved
highways of extreme importance.
Since State and Federal aid have been made available the people of Baker
County are fast coming to a realization of the situation and are making
strenuous efforts to co-operate in highway improvement. No bond issues
have been voted in this County but an example of their enthusiasm is
supplied by the fact that private donations for co-operative improvement
of one road amount to $15,000.00.
State and Federal aid were extended in 1918 and the co-operation has
resulted in plans for improving three sections of the Baker-Cornucopia
Highway. Other roads in the County will receive the consideration of the
Highway Commission during the coming season.
Four sections of the Baker-Cornucopia Highway have been surveyed, and
plans for three of these are nearly complete. Together the four sections
make about thirty-eight miles of location survey. Construction work will
begin on this road early in the coming season.
Survey of the Baker-Cornucopia Highway
During 1917 and 1918 the State Highway Department surveyed a greater
part of the Baker-Cornucopia Highway. The policy of giving first
attention to those portions of the road most in need of improvement
resulted in the surveying of four separate sections. These sections are
designated as follows: Baker-Middle Bridge; Love Bridge-Black Bridge;
Canyon and Sag Sections. These surveys were made under the direction of
J. O. Kingsley and W. C. Crews, locating engineers for the State Highway
Department.
The Baker-Middle Bridge section extends from Baker to a point near
Middle Bridge on Lower Powder River. Beginning at Baker the line follows
closely the present main traveled road east for about six miles, thence
along the Palmer road to the present crossing at Ruckles Creek, thence
down Ruckles Creek to a point about two miles south of Keating, thence
easterly, leaving Ruckles Creek, and entering the lower Powder River
Valley near Middle Bridge. This survey is 18.64 miles in length. The
plans for this work are completed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account