Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918Benson, Simon
History
Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
No plans have been made for financing the Love Bridge-Black Bridge
Section which was surveyed in 1917. This is an important section of the
road and will probably receive early attention from the State Highway
Commission.
BENTON COUNTY
During 1917 and 1918, very little work was done by the Highway
Department in Benton County. At the request of the County Court a short
section of the West Side Highway north of Corvallis was staked for
grading to be done by the County, and designs were prepared for three
concrete structures. Two of these were for box culverts for the Pacific
Highway about five miles north of Corvallis. The other was for an 85
foot reinforced concrete bridge over a mill race south of Corvallis. A
short reconnaissance was made of the Corvallis-Newport road between
Blodgett and Eddyville.
For work to be done in Benton County in 1919, the Highway Commission has
set aside $129,500.00. With this amount it is planned to pave the West
Side Highway from Corvallis north to the Polk County Line, approximately
seven miles.
CLACKAMAS COUNTY
The work under the supervision of the Highway Department in Clackamas
County during 1917 and 1918 has consisted of 4.5 miles of grading
between New Era and Oregon City, 7.5 miles of paving between Oregon City
and Canby, and 0.2 miles of grading between Oswego and the Multnomah
County Line. The first of these jobs was done by the State and County in
co-operation; the second was a strictly State job; and the third was a
County job supervised by the State.
The total expenditure on the work done in Clackamas County was
$198,952.24, of which Clackamas County paid $43,091.14 and the State
$155,861.10.
Between New Era and Oregon City, the Pacific Highway has been graded on
an entirely new location, paralleling the Southern Pacific Railway along
the bank of the Willamette River instead of following the location of
the old road farther back from the river, where the grading is not so
heavy, but where a number of heavy grades are required. In addition to
eliminating these heavy grades, a considerable saving in distance is
effected, and the dangerous crossing under the Southern Pacific tracks
at Oregon City is avoided.
Grading--Vicinity of New Era
On August 20, 1917, bids were considered by the State Highway Commission
for the grading of two and one-half miles on the Pacific Highway near
New Era. The most satisfactory proposal received was a cost plus ten per
cent proposal submitted by the Warren Construction Company, and a
contract was entered into with that firm on the cost plus ten per cent
basis.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account