On this section the unit costs show a slight advantage in favor of doing
the work with State forces. Conditions were practically the same as on
the Clatskanie-Westport Section in Columbia County--the State paying
higher wages than the contractor, but the contractor having the
disadvantage of more unfavorable weather conditions. The main advantage
in the State doing this work was gained by having better control of the
organization and more direct supervision of the work.
The original intention was to complete all macadam 16-feet wide but the
increased cost of labor, supplies, etc., made it necessary to reduce the
width of the macadam to nine feet so as to complete the full distance
with the money available.
COST STATEMENT--SVENSEN-WESTPORT MACADAM
===========================+==========+=========+============+=======
Item | Unit | Quan- | Cost | Unit
| | tity | | Cost
---------------------------+----------+---------+------------+-------
By Warren Construction Co.,| | | |
on cost plus contract-- | | | |
Clearing and grubbing | Acres | 1 |$ 112.18 |$112.18
Excavation | Cu. Yd. | 9,069 | 6,468.95 | .71
6-inch by 12-inch pipe | Foot | 1,519 | 4,472.69 | 2.90
Waterbound macadam |[8]Cu. Yd.| 13,409 | 53,010.60 | 3.95
Engineering | ... | ... | 971.84 | ...
By State Forces-- | | | |
Excavation | Cu. Yd. | 11,512 | 7,540.71 | .64
6-inch by 12-inch pipe, | Foot | 1,760 | 328.80 | .19
laying only | | | |
Waterbound macadam | Cu. Yd. | 34,722 | 134,022.23 | 3.86
Engineering | | | 1,651.69 | ...
| | +------------+
Total | ... | ... |$208,579.69 | ...
---------------------------+----------+---------+------------+-------
[8] Including 1,839 cubic yards of gravel purchased at a cost of
$1,839.00 and 5,278 cubic yards crushed rock purchased at a cost of
$6,333.60. All other rock was crushed and cost of crushing is included
in the cost of the macadam.
[Illustration: COVERED WOOD DRAWBRIDGE ON THE COLUMBIA RIVER HIGHWAY IN
CLATSOP COUNTY, OVER THE JOHN DAY RIVER EAST OF ASTORIA. BUILT IN 1918.
LIFT SPAN--40 FEET]
John Day River Bridge
As a part of the improvement of the Columbia River Highway between
Astoria and Svensen, a bridge was constructed over the John Day River
about four miles east of Astoria.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account