Torpedoes and Torpedo Warfare: Containing a Complete and Concise Account of the Rise and Progress of Submarine WarfareSleeman, Charles William
History
Torpedoes and Torpedo Warfare: Containing a Complete and Concise Account of the Rise and Progress of Submarine Warfare
Sleeman, Charles William
Torpedoes
A leading block for the tow rope is placed on the deck by span or bolt
a few feet in front of the brake. The safety key reel, if used, must
be fixed in a convenient position on deck, that the man attending it
can see how to control it; in a properly constructed vessel he would be
in the pilot house. The safety key line leads through a small leading
block on the ensign staff or some convenient point abaft the lead of
the tow rope, 15 to 20 feet above the water. The leading block on
the yard may be fitted with a lizard, if thought necessary. A sharp
instrument should be kept by the brakes ready to sever the tow rope.
In large men of war, arrangements are made for carrying a loaded
torpedo and two buoys in a convenient position on each side of the
vessel, in such a manner that the tow line can be bent, the exploding
bolt screwed in, the levers adjusted, and the torpedoes and buoys
dropped simultaneously when required.
_Preparing the Torpedoes for Use._--The torpedoes, port and starboard,
loaded and ballasted, having been hoisted out of the torpedo room, are
placed on the deck on their own sides, with their heads forward under
the leading block, and the buoys placed abaft them and strung together;
the exploding bolts are now entered into the torpedoes, and forced down
until their safety keys rest on the brass work, taking care that each
safety key points in the direction of the eye through which its lanyard
has to pass; the levers are now secured by their lanyards, as explained
at pages 120 and 121. The eye at the end of the buoy rope is now rove
through the large or small ring in the stern end of the torpedo. The
tow rope having been previously rove through the leading block on the
deck and on the yard, is rove through the thimble of the slings from
forward aft, and bent, with a single or double sheet bend, to the
eye of the buoy rope. The safety key line having been previously rove
through the leading block on the ensign staff, and the lanyard on the
safety key having been led through the eye of the handle, making a fair
lead with the slit in the bolt, are bent together with a double sheet
bend, and stopped to the eye of the handle by a split yarn of suitable
strength, the yarn having been first secured to the line by a round
turn outside the bend.
The line should also be stopped with another split yarn round all parts
of the slings close up to the thimble, having first made an overhand
knot in the line at a distance a few inches longer than that between
the eye bolt and the thimble.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account