Trains of Recollection: Drawn from Fifty Years of Railway Service in Scotland and Canada, and told to Arthur HawkesHanna, D. B. (David Blyth)
History
Trains of Recollection: Drawn from Fifty Years of Railway Service in Scotland and Canada, and told to Arthur Hawkes
Hanna, D. B. (David Blyth)
Canadian National Railways; Railroads -- Canada; Railroads -- Scotland
Several subdivisions can now carry heavy locomotives for which
such power is not available. It is, therefore highly desirable in
the interest of economy, that additional freight locomotives be
purchased. A few large passenger engines are also badly needed in
order to satisfactorily handle heavy through trains on certain
sections. Five powerful freight locomotives of special design are
essential to handle coal traffic on the Bickerdike branches of the
Grand Trunk Pacific. These locomotives would effect very substantial
economies, and fully justify the expense involved.
PASSENGER CARS:--One of the first and most urgent problems of the
National Railways was the securing of sufficient passenger cars to
handle returning overseas military forces. One hundred and thirty
steel Colonist cars with wood interior finish were ordered for the
earliest possible delivery.
The shortage of general passenger equipment was also extreme. A
considerable number of cars in service at that time were wholly
unsuitable on account of age, weakness, and obsolete character. The
constant increase in the number of cars required to be handled on
long-run passenger trains led us to adopt all-steel equipment for
main line services. Very careful consideration was given to design,
and the new passenger equipment is fully equal to that of any other
line.
FREIGHT CARS:--As there was much variation in the freight cars
previously ordered by the several lines, each design was carefully
considered, and new standards adopted.
Heavier locomotives and longer trains imposed such severe stresses
upon the older types of wooden cars that many more repairs were
required. During the war cars in bad order accumulated. During
Government Control in the United States all freight cars were pooled,
and equipment repairs greatly neglected. When Canadian cars were
returned in great volume last fall and winter a large percentage were
in defective condition. Recently about ten per cent. of our freight
cars were in bad order, or about twice the normal number.
Contracts were placed with Canadian car builders some time ago to
make heavy repairs to three thousand cars and the forces in our own
shops were augmented. The freight equipment should be in normal
condition by September 1st.
A serious trouble with freight cars of older designs is the pulling
off of wooden draft timbers. Four years ago we began to replace
wooden draft timbers with steel members. This greatly reduces the
cost of repairs, delays to shipments and trains, and prolongs the
life of cars.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account