Transactions of the American Society of Civil Engineers, vol. LXX, Dec. 1910: Federal Investigations of Mine Accidents, Structural Materials and Fuels. Paper No. 1171Wilson, Herbert M. (Herbert Michael)
History
Transactions of the American Society of Civil Engineers, vol. LXX, Dec. 1910: Federal Investigations of Mine Accidents, Structural Materials and Fuels. Paper No. 1171
Wilson, Herbert M. (Herbert Michael)
Building materials; Civil engineering -- Periodicals; Coal mines and mining -- Safety measures; Fuel
The apparatus consists of an electric resistance furnace containing
coils of nickel wire, a small (interchangeable) multi-tubular boiler,
and a steam-jet apparatus for reducing the air pressure at the exit end,
so as to cause a flow of air through the boiler. A surface condenser was
attached to the boiler’s steam outlet, the condensed steam being weighed
as a check on the feed-water measurements. A number of thermometers and
thermo-couples were used to obtain atmospheric-air temperature,
temperatures of the air entering and leaving the boilers, and feed-water
temperature.
The apparatus is now being reconstructed with appliances for measuring
the quantity of air entering the furnace, and an automatic
electric-furnace temperature regulator.
[Illustration: PLATE XIX.
Fig. 1.--Gas Producer, Economizer, and Wet Scrubber.
Fig. 2.--Producer Gas: Dry Scrubber and Gas Holder.]
Three sizes of boiler have been tested thus far, the dimensions being as
given in Table 4.
Each of the three boilers was tested at several temperatures of entering
air, up to 1,500° Fahr., about ten tests being made at each temperature.
It is also the intention to run, on these three boilers, about eight
tests at temperatures of 1,800°, 2,100° and 2,400° Fahr., respectively.
A bulletin on the work already done, together with much incidental
matter, is in course of preparation.[18]
TABLE 4.--Dimensions of Boilers Nos. 1, 2, and 3.
------------------------------------+--------+--------+--------
Items. | Boiler | Boiler | Boiler
| No. 1. | No. 2. | No. 3.
------------------------------------+--------+--------+--------
Distance, outside to outside of | | |
boiler heads, in inches | 8.28 | 8.28 | 16.125
Actual outside diameter of flues, | 0.252 | 0.313 | 0.252
in inches | | |
Actual inside diameter of flues, | 0.175 | 0.230 | 0.175
in inches | | |
Number of flues (tubes) | 10 | 10 | 10
------------------------------------+--------+--------+--------
The work on the first three boilers is only a beginning; preparations
are being made to test eight more multi-tubular boilers of various
lengths and tube diameters, under similar conditions. Because of the
experience already obtained, it will be necessary to make only eight
tests at each initial air temperature.
When the work on multi-tubular boilers is completed, water-tube boilers
will be taken up, for which a fairly complete outline has been prepared.
This second or water-tube portion of the investigation is really of the
greater scientific and commercial interest, but the multi-tubular
boilers were investigated first because the mathematical treatment is
much simpler.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account