An investigation of the comparative adaptability of gasoline and alcohol
to use in internal-combustion engines, consisting of more than 2,000
tests, was made at the temporary fuel-testing plant of the Geological
Survey, at Norfolk, Va., in 1907. A detailed report of these tests is in
preparation.[24] A similar investigation of the comparative adaptability
of kerosenes has been commenced, with a view to obtaining data on their
economical use, leading up to the investigation of the comparative fuel
values of the cheaper distillates and crude petroleum, as before
discussed.
_Washing and Coking Tests._--The investigations relating to the
preparation of low-grade coals, such as those high in ash or sulphur, by
processes that will give them a higher market value or increase their
efficiency in use, are in charge of Mr. A. W. Belden. They include the
washing and coking tests of coals, and the briquetting of slack and
low-grade coal and culm-bank refuse so as to adapt these fuels for
combustion in furnaces, etc.
This work has been conducted in the washery and coking plant temporarily
located at Denver, Colo., and in Building No. 32 at the Pittsburg
testing station, where briquetting is in progress. The details of these
tests are set forth in the various bulletins issued by the Geological
Survey.[25]
The washing tests are carried out in the following manner: As the raw
coal is received at the plant, it is shoveled from the railroad cars to
the hopper scale, and weighed. It then passes through the tooth-roll
crusher, where the lumps are broken down to a maximum size of 2½ in. An
apron conveyor delivers the coal to an elevator which raises it to one
of the storage bins. As the coal is being elevated, an average sample
representing the whole shipment is taken. An analysis is made of this
sample of raw coal and float-and-sink tests are run to determine the
size to which it is necessary to crush before washing, and the
percentage of refuse with the best separation. From the data thus
obtained, the washing machines are adjusted so that the washing test is
made with full knowledge of the separations possible under varying
percentages of refuse. The raw coal is drawn from the bin and delivered
to a corrugated-roll disintegrator, where it is crushed to the size
found most suitable, and is then delivered by the raw-coal elevator to
another storage bin. The arrangement of the plant is such that the coal
may be first washed on a Stewart jig, and the refuse then delivered to
and re-washed on a special jig, or the refuse may be re-crushed and then
re-washed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account