The drills employed were of various patterns. The first one employed was
the Dubois & François “perforator,” in which the drill-bit was fed
forward by hand. This was replaced by Ferroux drills having an automatic
feed. Jules McKean’s “perforator” was employed at the north end of the
tunnel. All of these drills were of the percussion type, and were
mounted on carriages running on tracks. Their comparative efficiency was
officially tested in drilling granitic gneiss with an operating air
pressure of 5.5 atmospheres with the following results:
NAME OF DRILL. PENETRATION
INS. PER MIN.
Ferroux 1.6
McKean 1.4
Dubois & François 1.04
Soummelier 0.85
The heading was excavated by the circular cut method, the holes being
driven as follows: Near the center of the heading three holes were first
drilled, converging so as to inclose a pyramid with a triangular base.
Around these center holes from 9 to 13 others were driven parallel to
the tunnel axis. The center holes were blasted first, and then the
surrounding holes. From 3 to 5 hours were required to drill the two sets
of holes, and from three to four hours were required to remove the
blasted rock. The number of holes drilled in removing each of the
various parts was as follows:
Part No. 1 6 to 9
Part No. 2 6 to 10
Part No. 3 2
Part No. 4 6 to 9
Part No. 5 3
Part No. 6 6 to 9
Part No. 7 1
--------
Total for full section 36 to 40
=Hauling.=--Two different systems were employed for hauling the spoil
and construction material in the St. Gothard tunnel. To remove the spoil
from parts Nos. 1 and 2 a narrow-gauge track was laid on the floor of
the heading, and the cars were hauled by horses, the grade being
descending from the fronts. These narrow-gauge cars were dumped into
larger broad-gauge cars running on the track laid on the floor of the
completed section and hauled by compressed air locomotives (Fig. 63). To
raise the incoming structural material from the broad-gauge cars to the
narrow-gauge cars running on the level above, hoisting devices were
employed.
[Illustration: FIG. 62.--Method of Strutting Roof, St. Gothard Tunnel.]
[Illustration: FIG. 63.--Sketch Showing Arrangement of Car Tracks, St.
Gothard Tunnel.]
FORT GEORGE TUNNEL.[10]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account