Assuming the Belgian method is to be the one adopted, the first work is
to drive a center bottom drift, the floor of which is at the level of
the extrados of the invert. This drift is immediately strutted by
successive transverse frames made up of a sill, side posts, and a cap
which support a close plank strutting or lining, with its joints packed
with straw. Between the side posts of each cross-frame, at about the
height of the intrados of the invert, a cross-beam is placed; and on
these cross-beams a plank flooring is laid, which divides the drift
horizontally into two sections, as shown by Fig. 108; the lower section
forming a covered drain for the seepage water, and the upper providing a
passageway for workmen and cars. The bottom drift is driven as far ahead
as practicable, in order to drain the sand for as great a distance in
advance of the work as possible. After the construction of the bottom
drainage drift the excavation proper is begun, as it ordinarily is in
the Belgian method by driving a top center heading, as shown by Fig.
108. This heading is deepened and widened after the manner usual to the
Belgian method, until the top of the section is open down to the
springing lines of the roof arch. To collect the seepage water from the
center top heading it is provided with a center bottom drain constructed
like the drain in the bottom drift, as shown by Fig. 108. When the top
heading is deepened to the level of the springing lines of the roof
arch, its bottom drain is reconstructed at the new level, and serves to
drain the full top section opened for the construction of the roof arch.
This top drain is usually constructed to empty into the drain in the
bottom drift.
[Illustration: FIG. 108.--Sketch Showing Preliminary Drainage Galleries,
Quicksand Method.]
[Illustration: FIG. 109.--Sketch Showing Construction of Roof Strutting,
Quicksand Method.]
=Strutting.=--The method of strutting the bottom drift has already been
described. For the remainder of the excavation the regular Belgian
method of radial roof strutting-frames is employed, as shown by Fig.
109. Contrary to what might be expected, the number of radial struts
required is not usually greater than would be used in many other soils
besides quicksand. Single-track railway tunnels have been constructed
through quicksand in several instances where the number of radial props
required on each side of the center did not exceed four or five. It is
necessary, however, to place the poling-boards very close together, and
to pack the joints between them to prevent the inflow of the fine sand.
In strutting the lower part of the section it is also necessary to
support the sides with tight planking. This is usually held in place by
longitudinal bars braced by short struts against the inclined props
employed to carry the roof arch when the material on which they
originally rested is removed. This side strutting is shown at the right
hand of Fig. 110.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account