_Cross-Section._--The subway being built for two tracks in some places
and for four tracks in other places, it was necessary to vary the form
and dimensions of the cross-section. The cross-sections actually adopted
are of three types. Fig. 115 shows the section known as the wide-arch
type, in which the lining is solid masonry. The second type was known as
the double-barrel section, and is shown by Fig. 116. The third type of
section is shown by Fig. 117. The lining consists of steel columns
carrying transverse roof girders, the roof girders being filled between
with arches, and the wall columns having concrete walls between them.
The wide-arch type and the double-barrel type of sections were employed
in some portions of the Tremont St. line, where the traffic was very
dense, since it was possible to construct them without opening the
street. Much of the wide-arch line was constructed by the use of the
roof shield, which is described in the succeeding chapter on the shield
system of tunneling.
[Illustration: FIG. 116.--Double-Barrel Section, Boston Subway.]
_Methods of Construction._--Several different methods were employed in
constructing the subway. Where ample space was available, the single
wide trench method of cut-and-cover construction was employed, the earth
being removed as fast as excavated. In the streets, except where regular
tunneling was resorted to, the parallel trench or transverse trench
cut-and-cover methods were employed.
In the transverse trench method, trenches about 12 ft. wide were
excavated across the street, their length being equal to the extreme
transverse width of the tunnel lining, and their depth being equal to
the depth of the tunnel floor. These trenches were begun during the
night, and immediately roofed over with a timber platform flush with the
street surface. Under these platforms the excavation was completed and
the lining built. As each trench or “slice” was completed, the street
above it was restored and the platform reconstructed over the succeeding
trench or slice. During the construction of each slice the street
traffic, including the street cars, was carried by the timber platform.
[Illustration: FIG. 117.--Four-Track Rectangular Section, Boston
Subway.]
[Illustration: FIG. 118.--Section Showing Slice Method of Construction,
Boston Subway.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account