=Rear-end Construction.=--By the rear end of the shield is meant that
portion at the rear of the diaphragm. It may be divided into two parts,
called respectively the body and the tail of the shield. The chief
purpose of the body of the shield is to furnish a place for the location
of the jacks, pumps, motors, etc., employed in manipulating the shield.
It also serves a purpose in distributing the weight of the shield over a
large area. To facilitate the passage of the shield around curves, or
in changing from one grade to another, it is desirable to make the body
of the shield as short as possible. In the Mersey, Clichy, and Waterloo
tunnel shields, and, in fact, in most others which have been employed,
the shell plates of the body have been reinforced by a heavy cast-iron
ring, within and to which are attached the jacks and other apparatus.
The latest opinion, however, seems to point to the use of brackets and
beams for strengthening the shell for the purpose named, rather than to
this heavy cast-iron construction. In the Hudson River, St. Clair River,
and East River tunnel shields, with their long and strongly braced
front-end construction to carry the jacks, the body of the shield, so to
speak, is omitted and the rear-end construction consists simply of the
tail plating. In the Blackwall shield, the body of the shield shell
provides the space necessary for the double diaphragms and the cells
which they inclose. In a general way, it may be said that the present
tendency of engineers is to favor as short and as light a body
construction as can be secured.
The tail of the shield serves to support the earth while the lining is
being erected; and for this reason it overlaps the forward ring of the
lining, as shown clearly by most of the shields illustrated. To fulfill
this purpose, the tail-plates should be perfectly smooth inside and
outside, so as to slide easily between the outside of the lining plates
and the earth, and should also be as thin as practicable, in order not
to leave a large void behind the lining to be filled in. In soils which
are fairly stable, the tail construction is often visor-shaped; that is,
the tail-plates overlap the lining only for, say, the roof from the
springing lines up, as in one of the shields for the Clichy tunnel. In
unstable materials the tail-plating extends entirely around the shield
and excavation. The length of the tail-plating is usually sufficient to
overlap two rings of the lining, but in one of the Clichy tunnel shields
it will be noticed that it extended over three rings of lining. This
seemingly considerable space for thin steel plates is made possible by
the fact that the extreme rear end of the tail always rests upon the
last completed ring of lining.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account