=Grouting.=--From the exterior of the tunnel already lined with
cast-iron rings, grout was forced through the holes closed by
screw-plugs, at a pressure of 90 lbs. per sq. in. The grout was composed
of 1 Portland cement and 1 sand by volume and was forced in by a
specially constructed machine, so it formed a shell of cement nearly 3
ins. thick around the exterior of the iron lining. The grouting began at
the lower segment; the cement was forced in until it reached the hole
above, then the hole was plugged, and the grouting was carried on from
the consecutive hole and so on until all the tunnel was finally encased
in grout, as it filled every crevice between the outside of the lining
and the ground as excavated. The cast-iron rings of the tunnel were
covered with a concrete lining which was placed in the following order:
First, on the invert; second, on the duct benches; third, on the arch;
fourth, on the ducts; fifth, on the face of the bench. Before any
concrete was placed, the surface of the iron was cleaned by scrapers and
wire brushes and by washing it with water. The invert was built in
sections 30 ft. long and the duct benches were constructed soon after.
These duct benches were built with several steps for the ducts to be
laid later. They were built by means of a traveling stage on wheels
which ran on tracks on the working platform of the tunnel. The arch was
constructed soon after. First the portion from the duct benches to the
haunches, then the arch proper, was built on traveling centers on tracks
laid on the steps of the duct benches. The concrete was received in
³⁄₄-cu.-yd. dumping buckets, from the flat cars on which they were run;
the buckets were hoisted to the level of the lower platform of the arch
by a small Lidgerwood compressed air hoister. At this level the concrete
was dumped on a traveling car or stage and moved in that to the point
on the form where it was to be placed. For the lower part of the arch
the concrete was thrown directly into the form from this traveling part
of the stage. Fig. 140 shows the cross-section of the tunnel with the
iron lining and concrete.
[Illustration: Section in Sand and Gravel or Rock
Section in Hudson River Silt, with foundations
FIG. 140.--Typical Cross-Sections of One Tube of Pennsylvania Railroad
Tunnel Under the Hudson River.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account