Whether the engineer should adopt water-power or steam to generate the
power required for his excavating machinery depends upon their relative
availability, cost, and suitability to the conditions of work in each
particular case. Where fuel is plentiful and cheap, and where
water-power is not available at a comparatively reasonable cost,
steam-power will nearly always prove the more economical; where,
however, the reverse conditions exist, which is usually the case in a
mountainous country far from the coal regions, and inadequately supplied
with transportation facilities, but rich in mountain torrents,
water-power will generally be the more economical. In a succeeding
chapter the power generating and transmission plants for a number of
rock tunnels are described, and here only a general consideration of the
subject will be presented.
=Steam-Power Plant.=--A steam-power plant for tunnel work should be much
the same as a similar plant elsewhere, except that in designing it the
temporary character of its work must be taken into consideration. This
circumstance of its temporary employment prompts the omission of all
construction except that necessary to the economical working of the
plant during the period when its operation is required. The power-house,
the foundations for the machinery, and the general construction and
arrangement, should be the least expensive which will satisfy the
requirements of economical and safe operation for the time required. It
will often be found more economical as a whole to operate the machinery
with some loss of economy during the short time that it is in use than
to go to much greater expense to secure better economy from the
machinery by design and construction, which will be of no further use
after the tunnel is completed. The longer the plant is to be required,
the nearer the construction may economically approach that of a
permanent plant. As regards the machinery itself, whose further
usefulness is not limited by the duration of any single piece of work,
true economy always dictates the purchase of the best quality. Speaking
in a general way, a steam-power plant for tunnel work comprises a boiler
plant, a plant of air compressors with their receivers, and an electric
light dynamo. When hydraulic transmission of power is employed, the air
compressors are replaced by high-pressure pumps; and when electric
hauling is employed, one or more dynamos may be required to generate
electricity for power purposes, as well as for lighting. In addition to
the power generating machines proper, there must be the necessary piping
and wiring for transmitting this power, and, of course, the equipment of
drills and other machines for doing the actual excavating, hauling, etc.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account