The compressed air was conveyed from each end through a cast-iron pipe
7⁵⁄₈ in. in diameter, up to the front of the excavation. The joints of
the pipes were made with turned faces, grooved to receive a ring of
oakum which was tightly screwed and compressed into the joint. To
ascertain the amount of leakage of the pipes, they and the tanks were
filled with air compressed to 6 atmospheres, and the machines stopped;
after 12 hours the pressure was reduced to 5.7 atmospheres, or to 95% of
the original pressure.
Sommeilier’s percussion drilling machines were used in the excavation of
this tunnel. They were provided with 8 or 10 drills acting at the same
time, and mounted on carriages running on tracks. These were withdrawn
to a safe place during the blasting, and advanced again after the broken
rock was removed from the front and the new tracks laid.
Machine shops were built at both ends of the tunnel for building and
repairing the drilling machines, bits, tools, etc. A gas factory was
built at each end for lighting purpose.
_Hoosac Tunnel._--The Hoosac tunnel on the Fitchburg R.R. in
Massachusetts is 25,000 ft. long, and the longest tunnel in America. The
material through which the tunnel was driven was chiefly hard granitic
gneiss, conglomerate, and mica-schist rock. The excavation was conducted
from the entrances and one shaft, the wide heading and single-bench
method being employed, with the center-cut system of blasting which was
here used for the first time. The tunnel was begun in 1854, and
continued by hand until 1866, when the mechanical plant was installed.
Most of the particular machines employed have now become obsolete, but
as they were the first machines used for rock tunneling in America they
deserve mention. The drills used were Burleigh percussion drills,
operated by compressed air. Six of these drills were mounted on a single
carriage, and two carriages were used at each front. The air to operate
these drills was supplied by air compressors operated by water-power at
the portals and steam-power at the shaft. The air compressors consisted
of four horizontal single-acting air cylinders with poppet valves and
water injection. The compressors were designed by Mr. Thomas Deane, the
chief engineer of the tunnel.
_Palisades Tunnel._--The Palisades tunnel was constructed to carry a
double track railway line through the ridge of rocks bordering the west
bank of the Hudson River and known as the Palisades. It was located
about opposite 116th St. in New York City. The material penetrated was a
hard trap rock very full of seams in places, which caused large
fragments to fall from the roof. The excavation was made by a single
wide heading and bench, employing the center-cut method of blasting with
eight center holes and 16 side holes for the 7 × 18 ft. heading.
Ingersoll-Sergeant 2¹⁄₂ in. drills were used, four in each heading and
six on each bench, and 30 ft. per 10 hours was considered good work for
one drill.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account