Before entering upon a description of the constructive details of this,
the longest railway tunnel in the world, it may be well to give a
general idea of the undertaking. Many schemes for the connection of
Italy and Switzerland by a railway near the Simplon Road Pass have been
devised, including one involving no great length of underground work,
the line mounting by steep gradients and sharp curves. The present
scheme, put forward in 1881 by the Jura-Simplon Ry. Co., consists
broadly of piercing the Alps between Brigue, the present railway
terminus in the Rhone Valley, and Iselle, in the gorge of the Diveria,
on the Italian side, from which village the railway will descend to the
existing southern terminus at Domo d’Ossola, a distance of about 11
miles.
[8] Abstract from a paper read before the Institution of Civil
Engineers by Charles B. Fox, Jan. 26, 1900.
In conjunction with this scheme a second tunnel is proposed, to pierce
the Bernese Alps under the Lötschen Pass from Mittholz to a point near
Turtman in the Rhone Valley; and thus, instead of the long détour by
Lausanne and the Lake of Geneva, there will be an almost direct line
from Berne to Milan _via_ Thun, Brigue, and Domo d’Ossola.
Starting from Brigue, the new line, running gently up the valley for
1¹⁄₄ miles, will, on account of the proximity of the Rhone, which has
already been slightly diverted, enter the tunnels on a curve to the
right of 1050 ft. radius. At a distance of 153 yards from the entrance,
the straight portion of the tunnel commences, and extends for 12 miles.
The line then curves to the left with a radius of 1311 ft. before
emerging on the left bank of the Diveria. Commencing at the northern
entrance, a gradient of 1 in 500 (the minimum for efficient drainage)
rises for a length of 5¹⁄₂ miles to a level length of 550 yards in the
center, and then a gradient of 1 in 143 descends to the Italian side. On
the way to Domo d’Ossola one helical tunnel will be necessary, as has
been carried out on the St. Gothard. There will be eventually two
parallel tunnels having their centers 56 ft. apart, each carrying one
line of way; but at the present time only one heading, that known as No.
1, is being excavated to full size, No. 2 being left, masonry lined
where necessary, for future developments. By means of cross headings
every 220 yds. the problems of transport and ventilation are greatly
facilitated, as will be seen later. As both entrances are on curves, a
small “gallery of direction” is necessary, to allow corrections of
alinement to be made direct from the two observatories on the axis of
the tunnel.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account