Two Centuries of Shipbuilding by the Scotts at GreenockScotts' Shipbuilding & Engineering Co. Ltd.
History
Two Centuries of Shipbuilding by the Scotts at Greenock
Scotts' Shipbuilding & Engineering Co. Ltd.
Scotts' Shipbuilding & Engineering Co. Ltd.; Shipbuilding -- Great Britain
Rapidity of construction has been characteristic of the engine and
boiler works of the Scotts to at least as great an extent as in the
shipbuilding yard. Several instances might be noted, beginning with six
blockade-runners, built in a very short period, in 1864, and fitted
with engines to give a speed of 12 knots at sea and 13-1/2 knots on
trial. A recent and striking instance is the construction of boilers
and engines for twenty of the passenger steamers built for traffic on
the Thames, to the order of the London County Council, and described on
pages 83 and 84, _ante_. The contract for this work was signed towards
the end of November, 1904, and work was commenced about the beginning
of December. The various parts of the engines were being machined and
finished during the month of January and the beginning of February,
1905; and all of the twenty sets of engines and boilers were completed
by the end of May. Another noteworthy case is the construction of the
machinery for the steamship _Fengtien_, described on page 80, _ante_.
Work was commenced on the machinery in the middle of January, and
finished about the end of April. The machinery was fitted in the ship
and ready for the trials on the 29th May. The total time taken from
the beginning of work was well under five months.[69]
[Illustration: Plate XLIX. VIEW IN MAIN MACHINE SHOP.]
The pattern shop, where all work originates, is fitted with the usual
pattern-making machinery, including a core-making machine.
The iron foundry, which was begun in 1790,[70] and around which the
large engineering establishment has since been raised step by step,
continues to do sound work. There are four cupolas, of a combined
capacity of about 20 tons, and cylinders up to 120 in. in diameter are
cast. These facts suggest the satisfactory character of the equipment.
The brass foundry is an equally important department, where first-class
work is done. There are fifty-two crucible pots in use, varying in
size up to 150 lb., and of a collective capacity of about 2 tons; also
an air furnace capable of producing at one heat 12 tons of metal, for
such heavy castings as are required for preparing shaft liners, large
sea chests for naval ships, etc. The strength of Admiralty gun metal
made in this foundry is up to 18 tons per square inch, with 30 per
cent. of elongation in a 2-in. length. The foundry is served by an
electrically-operated jib crane.
In the forge and smiths' shops a large amount of detail work is done,
in units ranging up to 3 tons in weight. The hammers vary up to 15 cwt.
power. A considerable amount of die-stamping is done in connection with
auxiliary engine forgings, etc. All paddle-wheels are made in this
department. The blast for the fires is got from an electrically-driven
fan.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account