U.S. Marine Operations in Korea, 1950-1953, Volume 1 (of 5): The Pusan PerimeterMontross, Lynn
History
U.S. Marine Operations in Korea, 1950-1953, Volume 1 (of 5): The Pusan Perimeter
Montross, Lynn
Korean War, 1950-1953 -- Campaigns; United States. Marine Corps -- History -- Korean War, 1950-1953
Murray ordered 1/5 to hold up until the 9th Infantry tied in on
Fenton’s right. Communist automatic weapons on Obong-ni Ridge fired on
the Marines sporadically during this interlude.
At 1000, while 1/5 was attacking to the west, the 3d Battalion had
swung southward behind Cloverleaf Hill to take positions on the 5th
Marines’ left. This was in preparation for Murray’s contemplated
assault on Obong-ni Ridge by two battalions. It was planned that
Newton’s unit would take the northern half of the long hill and 3/5 the
southern portion.
Company G led the 3d Battalion advance through the rice paddy south of
Cloverleaf Hill. Artillery and 75-mm. recoilless guns paved the way
by raking possible enemy hiding places, enabling the infantrymen to
proceed rapidly. Bohn’s destination was Hill 91, a shoe-like projection
jutting out from the southern reaches of Obong-ni Ridge. Reaching
the base of the high ground, Bohn requested that supporting fires
be lifted. Attached tanks, 75’s, and 1/11 immediately shifted their
destruction to Obong-ni Ridge.
Company G started up the slopes of Hill 91, while an attached 75-mm.
recoilless gun obliterated a wheel-mounted machinegun and its crew
going into position on the crest. The Marines had climbed only a few
yards when Bohn was ordered by Taplett at 1230 to withdraw the company
to Observation Hill.
Company H, then passing between Hill 91 and Observation Hill on its
way to Obong-ni’s eastern approaches, received the same order from the
Battalion commander. The assault on the ridge had been canceled, and
Murray was concentrating his regiment along the MSR.
_Two Marine Tanks Killed_
Throughout the Brigade advance on 5 September, the Marines were
hampered by heavy rain and fog which prevented MAG-33 and VMO-6 from
operating effectively. Thus the enemy was offered a rare opportunity to
mount a daylight attack.[346]
[346] This section is derived from: Annex How; LtCol M. R.
Olson, interv with author, 15 Jun 54; Taplett, 20 Apr
54; Muetzel, 5–6 Jan 54 (with comments by Maj J. R.
Stevens); and Fenton, 8 May 54.
After Company B received orders to hold up on Hill 125, Fenton
ordered his men to dig foxholes along the rain-soaked crest facing
Tugok village and Finger Ridge to the west and Obong-ni Ridge to the
southwest. The company commander directed the attached 1st Platoon of
tanks to remain in the road cut, just to the rear of the famous bend
around the forward slopes of Hill 125. Peering through the rain and
fog, the Marine tankmen could see the dead, black hulls of the three
T-34’s knocked out by the Brigade 2 weeks earlier.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account