The busiest Marines at Hagaru on the 27th were the men of the 1st
Engineer Battalion. While a Company B platoon built tent decks for the
Division CP, detachments of Company A were at work on the maintenance
of the MSR in the area, and Company D had the job of hacking out
the new airstrip. Apparently the latter project had its “sidewalk
contractors” even in sub-zero weather, for this comment found its way
into the company report:
Dozer work [was] pleasing to the eye of those who wanted activity
but contributed little to the overall earth-moving problem of
90,000 cubic yards of cut and 60,000 cubic yards of fill.[427]
[427] D/Engr _SAR_.
Motor graders and scrapers with a 5.8 cubic yard capacity had been
moved up from Hamhung. So difficult did it prove to get a bite of the
frozen earth that steel teeth were welded to the blades. When the pan
was filled, however, the earth froze to the cutting edges until it
could be removed only by means of a jack hammer.
The strip was about one-fourth completed on the 27th, according to
minimum estimates of the length required. Work went on that night
as usual under the flood lights.[428] Not until the small hours of
the morning did the first reports reach Hagaru of the CCF attacks on
Yudam-ni and Fox Hill.
[428] 1stEngrBn _SAR_, 11; and Partridge interv, 25 Jun 51.
Some remnants of 2/7 were still at Hagaru, for lack of transportation,
when Lieutenant Colonel Lockwood, commanding officer of the battalion,
received a dispatch from Colonel Litzenberg directing him to proceed to
Toktong Pass and assist Fox Company. At 0530 he requested the “loan”
of a rifle company of 3/1 to reinforce elements of Weapons Company
(-), 2/7. Lieutenant Colonel Ridge could spare only a platoon from How
Company, and at 0830 the attempt was cancelled. An hour later Weapons
Company and three tanks from the 2d Platoon of Company D, 1st Tank
Battalion, made another effort. They pushed half-way to the objective,
only to be turned back by heavy Chinese small-arms and mortar fire
from the high ground on both sides of the road. Supporting fires from
3/1 helped the column to break off contact and return to Hagaru at
1500.[429]
[429] 3/1 _SAR 26 Nov-15 Dec 50_, 4; 1stTkBn _SAR_, 21; 3/1 msg
to CO 1stMar, 1845 28 Nov 50.
No better success attended a reinforced platoon of How Company, 3/1,
accompanied by three Company D tanks, when it set out on the road to
Koto-ri. On the outskirts of Hagaru, within sight of Captain Corley’s
CP, the men were forced to climb down from their vehicles and engage in
a hot fire fight. They estimated the enemy force at about 50, but an OY
pilot dropped a message warning that some 300 Chinese were moving up
on the flanks of the patrol. The Marines managed to disengage at 1530,
with the aid of mortar and artillery fires from Hagaru, and returned to
the perimeter with losses of one killed and five wounded.[430]
[430] _Ibid._; Narrative of Maj C. E. Corley, n. d.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account