U.S. Marine Operations in Korea, 1950-1953, Volume 3 (of 5): The Chosin Reservoir CampaignMontross, Lynn
History
U.S. Marine Operations in Korea, 1950-1953, Volume 3 (of 5): The Chosin Reservoir Campaign
Montross, Lynn
Korean War, 1950-1953 -- Campaigns; United States. Marine Corps -- History -- Korean War, 1950-1953
Half an hour later, with the situation improving in the How Company
zone, the Battalion CP had its first alarming reports of reverses
on East Hill. The terrain itself had offered difficulties to men
scrambling up the steep, icy slopes with heavy burdens of ammunition.
These detachments of service troops, moreover, included a large
proportion of newly recruited ROKs who had little training and
understood no English.
[Illustration: EAST HILL ATTACKS
29 November
MAP-18
]
The largest of the East Hill units, Company D of the 10th Engineer
Combat Battalion, commanded by Captain Philip A. Kulbes, USA, was
composed of 77 American enlisted men and 90 ROKs. Combat equipment
(in addition to individual weapons) consisted of four .50 caliber
machine guns, five light .30 caliber machine guns, and six 3.5 rocket
launchers.[447]
[447] References to Co D, 10th Engr Bn, USA, are based on Lt
Norman R. Rosen, “Combat Comes Suddenly,” in Capt John
G. Westover, Ed., _Combat Support in Korea_ (Washington,
1955), 206–208.
The Army engineers had arrived at Hagaru at 1200 on the 28th, shortly
before the enemy cut the MSR. After being assigned to the East Hill
sector during the afternoon, the company used the few remaining hours
of daylight to move vehicles and gear back to an equipment park in the
perimeter. It was 2030 before the four platoons got into position on
East Hill after an exhausting climb in the darkness with heavy loads of
ammunition. Some use was made of existing holes, but most of the men
were not dug in when the Chinese attacked.
On the left the collapse of a ROK platoon attached to X Corps
Headquarters led rapidly to confusion everywhere on East Hill. Captain
Shelnutt, the Marine officer assigned to the Army engineers, found
that he could not close the gap by extending the line to the left. Nor
did the men, particularly the ROKs, have the training to side-slip
to the left under fire and beat off flank attacks. The consequence
was a general withdrawal on East Hill, attended in some instances by
demoralization. Shelnutt was killed as the four engineer platoons fell
back some 250 yards in “a tight knot,” according to Lieutenant Norman
R. Rosen, USA, commander of the 3d Platoon.
This was the situation as reported by the Marine radio operator, PFC
Bruno Podolak, who voluntarily remained as an observer at his post, now
behind enemy lines. At 0230 a telephone call to Colonel Bowser from the
3/1 CP was recorded in the message blank as follows:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account