U.S. Marine Operations in Korea, 1950-1953, Volume 4 (of 5): The East-Central FrontMontross, Lynn
History
U.S. Marine Operations in Korea, 1950-1953, Volume 4 (of 5): The East-Central Front
Montross, Lynn
Korean War, 1950-1953 -- Campaigns; United States. Marine Corps -- History -- Korean War, 1950-1953
Belated deliveries of aircraft delayed the commissioning of the world’s
first transport helicopter squadron, HMR-161, until 15 January 1951
at El Toro. Lieutenant Colonel George W. Herring was designated the
commanding officer and Lieutenant Colonel William P. Mitchell the
executive officer.
Nearly three months passed before the first three transport
helicopters arrived. The squadron was gradually built up to a
strength of 43 officers and 244 enlisted men with a full complement
of 15 HRS-1 helicopters. These Sikorsky aircraft, designed to
Marine specifications, were simply an enlarged three-place HO3S in
configuration, with a similar main rotor and vertical tail rotor. About
62 feet long with maximum extension of rotor blades, the HRS-1 was
11½ feet wide with the blades folded. Following are some of the other
statistics:
Gross weight at sea level, 7,000 pounds; cruising speed, 60 knots;
payload at sea level, 1,420 pounds; troop-lifting capacity, four to
six men with full combat equipment or three to five casualties in
litters.[283] Capabilities varied, of course, according to such factors
as altitude, temperature, and pilot experience.
[283] _Cavalry of the Sky_, 157.
Marine Transport Helicopter Squadron 161 arrived in Korea on the last
day of August, and by the 10th of September it had moved up to the
front, sharing Airfield X-83 (see Map 18) with VMO-6.[284] The 11th
was devoted to reconnaissance flights in search of landing sites, and
on the 12th the transport squadron was ready for its first combat
mission. A new means of logistical and tactical support that was to
revolutionize operations and create front page headlines had arrived in
Korea.
[284] Auxiliary airstrips in Korea had an “X” designation and
fields in the “K” category were major installations.
Those in proximity to U.S. Army centers were designated
“A.”
Prior to the squadron’s arrival, the Division chief of staff, Colonel
Victor H. Krulak, had held numerous planning conferences with Division
staff officers, and preparations for the employment of HMR-161 had
made noteworthy progress. Then General Thomas ordered executed the
first operation of the squadron under combat conditions, and the major
logistical problem of moving supplies and evacuating casualties was
well on the way to being solved. At 1600 on 13 September 1951--a date
that would have historical significance--Operation WINDMILL I was set
in motion.
Lieutenant Colonel Herring had attended the final planning conference
at Division headquarters at 0830 on the 13th, and he was told that the
operation would involve a lift of one day’s supplies to 2/1 over a
distance of seven miles. The commanding officer of 2/1 was to select
suitable landing points and the commanding officer of 1st Shore Party
Battalion had the responsibility of providing support teams to operate
at the embarkation and landing points.[285]
[285] LtCol H. W. Edwards, interv of 20 Feb 61.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account