There are in all eleven railways in the country, but one has practically
ceased to exist, and it is a long time since any train ran on it. The
total number of passengers carried in 1908 was 413,000, and nearly
184,000 tons of freight.
Of the eleven lines the oldest, strangely enough, is not in the _Centro_,
though, being connected with the main system by steamer, it may be
considered as part of it. This is the Bolivar Railway, which commenced
in 1873 as a line from Tucacas to the copper-mines of Aroa, and was
subsequently extended to Barquisimeto. It has a 24-inch gauge, and its
present length is 176·5 kilometres. The La Ceiba line was authorised
in 1880, and has a ·91-metre gauge, with a present length of 81·5
kilometres; the same year saw the commencement of the La Guaira-Carácas
Line, already described in an earlier chapter. Two years later a
1·07-metre line was commenced from the port of Guanta to Barcelona and
the Naricual coalmines. In 1884 the Maiquetia-Macuto street railway
was built to afford easy communication with the chief watering-place
of Venezuela; it has the same gauge (·91-metre) as the Carácas line
and is 8 kilometres in length. The railway from Carenero to Rio Chico
was commenced in 1884, and is now 50 kilometres long, but, like the
La Ceiba line, this is not part of the central system. The Central
Railway, originally planned in 1885 to connect Carácas and Valencia by a
circuitous route, never accomplished that end, and merely affords a means
of communication between Carácas and the towns of Miranda, and is now 42
kilometres in length, with a gauge of 1·07 metre. The Puerto Cabello and
Valencia line was commenced in the same year and is 54 kilometres long,
while the Gran Ferrocarril de Venezuela, the German line, was contracted
for in 1888, and at one and the same time obviated the extension of the
Central, as originally planned, and completed the nucleus railway system
of Central Venezuela as it exists to-day. It has a total length of 179
kilometres. The short line connecting Coro and La Vela was built in 1893,
and is, like the Táchira line, commenced at the same time, owned in the
country; the latter has a length to-day of 114·5 kilometres and is of
the standard Venezuelan gauge, 1·07 metre. The Santa Barbara-El Vigia
line was the last to be commenced (1896), but it has already fallen into
disrepair, and of the 60 kilometres little, if any, remains in usable
condition.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account